EBA ENGINEERING

Dead / Cancelled — Cancelled — Section 8 (as of 14 Jun 2024)

What this means for you

This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
85410885
Registration number
4444296
Mark type
Design + words
Filed
30 Aug 2011
Published for opposition
18 Jun 2013
Registered
03 Dec 2013

Goods and services

  • Class 037 — Building construction and repair services: CONSTRUCTION MANAGEMENT SERVICES; BUILDING INSPECTION IN THE COURSE OF BUILDING CONSTRUCTION
  • Class 042 — Scientific and technological services: TRANSPORTATION ENGINEERING; CIVIL ENGINEERING RELATING TO SITE EVALUATION AND FEASIBILITY STUDIES, STORM DRAIN AND STORM WATER INFRASTRUCTURE MANAGEMENT SYSTEM FEASIBILITY STUDIES AND DESIGN, FLOOD PLAINS, PUBLIC UTILITY SYSTEM, SEDIMENT CONTROL PLANS, SURVEYING AND MAPPING, WATER TREATMENT AND SEWAGE TREATMENT PLANTS, ENVIRONMENTAL ASSESSMENT AND PLANNING; SOLID WASTE FACILITY PLANNING AND DESIGN; GEOENVIRONMENTAL ENGINEERING; QUALITY CONTROL FOR OTHERS IN THE FIELD OF CONSTRUCTION, FIELD MATERIAL TESTING IN THE FIELD OF CONSTRUCTION; ENVIRONMENTAL SERVICES, NAMELY, ENVIRONMENTAL PLANNING AND DESIGN, ENVIRONMENTAL ASSESSMENT AND COMPLIANCE, INDUSTRIAL HYGIENE AND REMEDIATION

Owner

Prosecution history

  • 14 Jun 2024 — CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9
  • 03 Dec 2022 — COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
  • 27 Nov 2020 — NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED
  • 27 Nov 2020 — REGISTERED - SEC. 8 (6-YR) ACCEPTED
  • 26 Nov 2020 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
  • 09 Jul 2020 — POST REGISTRATION ACTION MAILED - SEC. 8
  • 30 Jun 2020 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 22 Apr 2020 — TEAS SECTION 8 RECEIVED
  • 03 Dec 2013 — REGISTERED-PRINCIPAL REGISTER
  • 29 Oct 2013 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE MAILED
  • 26 Oct 2013 — LAW OFFICE REGISTRATION REVIEW COMPLETED
  • 23 Oct 2013 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 08 Oct 2013 — STATEMENT OF USE PROCESSING COMPLETE
  • 30 Aug 2013 — USE AMENDMENT FILED
  • 07 Oct 2013 — CASE ASSIGNED TO INTENT TO USE PARALEGAL

View this trademark record on Marksy