AP TECHNOLOGY

Dead / Abandoned — Abandoned — failure to respond (as of 04 Feb 2016)

What this means for you

This application is over — abandoned 12 Jan 2016. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
85253255
Mark type
Stylized text
Filed
28 Feb 2011
Published for opposition
10 Apr 2012
Abandoned
12 Jan 2016
Attorney of record
George A. Pelletier, Jr.

Goods and services

  • Class 007 — Machines and machine tools: Machines and machine tools for manufacturing and processing aluminum, namely, high densification crushing machines for industrial purposes, mixing machines for industrial applications, metal extrusion presses, continuous metal casting machines, metal working machines, and rolling machines for rolling metals; machines and machine tools for aluminum casting, namely, high densification crushing machines for industrial purposes, mixing machines for industrial applications, metal extrusion presses, continuous metal casting machines, metal working machines, and rolling machines for rolling metals; machines and machine tools for the production of raw anodes, namely, high densification crushing machines for industrial purposes, mixing machines for industrial applications, metal extrusion presses, continuous metal casting machines, metal working machines, and rolling machines for rolling metals; machines and machine tools for cryolite processing and recycling, namely, high densification crushing machines for industrial purposes, mixing machines for industrial applications, continuous metal casting machines metal extrusion presses, metal working machines, and rolling machines for rolling metals; machines and machine tools for the handling and storage of raw materials, namely, machine operated platforms capable of elevation above ground level and used for storage and power-operated lift used to transport and place portable storage containers; power stations as machine and installation parts for aluminum production, namely, electricity generators for use in operating aluminum smelting and production equipment
  • Class 009 — Scientific and electric apparatus: Computer programs for use in operating, managing and optimizing machines used in the industrial production of aluminum smelters; computer software for use in operating, managing and optimizing machines used in the industrial production of aluminum smelters; computer application software for use in operating, managing and optimizing machines used in the industrial production of aluminum smelters; power stations as machine and installation parts for aluminum production, namely, power supplies specifically for use with aluminum smelting and production equipment
  • Class 011 — Environmental control apparatus: Machines and machine tools for the production and cooking of aluminum and raw aluminum anodes, namely, baking furnaces; machines and machine tools for aluminum casting, namely, baking furnaces; machines and machine tools for the production of raw anodes, namely, baking furnaces; machines and machine tools for cryolite processing and recycling, namely, baking furnaces
  • Class 042 — Scientific and technological services: Technical expertise and assistance with respect to building, installing, operating and maintaining aluminum foundry, smelting and production machinery, namely, technology consultation in the field of aluminum smelters, anode production plants, alumina refineries, aluminum, foundries, aluminum alloys and aluminum castings; testing, analysis and evaluation of metal tools, machinery and fabrication equipment used in the production of aluminum; technical consultation in the field of aluminum smelters, namely, testing and evaluation of aluminum smelting equipment to improve performance and efficiency of such equipment

Owner

Prosecution history

  • 04 Feb 2016 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 04 Feb 2016 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 09 Jul 2015 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 09 Jul 2015 — NON-FINAL ACTION E-MAILED
  • 09 Jul 2015 — SU - NON-FINAL ACTION - WRITTEN
  • 19 Jun 2015 — STATEMENT OF USE PROCESSING COMPLETE
  • 05 Jun 2015 — USE AMENDMENT FILED
  • 05 Jun 2015 — TEAS STATEMENT OF USE RECEIVED
  • 23 Dec 2014 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 22 Dec 2014 — SOU EXTENSION 5 GRANTED
  • 26 Nov 2014 — SOU EXTENSION 5 FILED
  • 26 Nov 2014 — SOU TEAS EXTENSION RECEIVED
  • 12 Jun 2014 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 11 Jun 2014 — SOU EXTENSION 4 GRANTED
  • 03 Jun 2014 — SOU EXTENSION 4 FILED