PRINCIPAL

Dead / Cancelled — Cancelled — Section 7 (surrendered) (as of 04 Nov 2011)

What this means for you

This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
85000669
Registration number
3947019
Mark type
Design + words
Filed
29 Mar 2010
Published for opposition
17 Aug 2010
Registered
19 Apr 2011

Goods and services

  • Class 042 — Scientific and technological services: Civil engineering; Consulting in the field of structural engineering; Consulting in the fields of engineering and architecture; Drawing up of plans and engineering drawings; Engineering; Engineering services for building and property condition assessment, facility management, repair and restoration, building instrumentation and monitoring, and environmental consulting; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Engineering services in the field of environmental compliance; Hydraulic engineering and design; Hydrologic and engineering modeling and design of measures to protect areas likely to be inundated by storm-water and flood-waters; Structural engineering design services; Traffic and transportation engineering

Owner

Prosecution history

  • 04 Nov 2011 — CANCELLED SECTION 7-TOTAL
  • 01 Nov 2011 — REQUEST FOR SECT 7 TOTAL SURRENDER FILED
  • 31 Oct 2011 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 28 Oct 2011 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 28 Oct 2011 — TEAS SECTION 7 SURRENDER RECEIVED
  • 19 Apr 2011 — REGISTERED-PRINCIPAL REGISTER
  • 11 Mar 2011 — TTAB RELEASE CASE TO TRADEMARKS
  • 11 Mar 2011 — OPPOSITION TERMINATED NO. 999999
  • 11 Mar 2011 — OPPOSITION DISMISSED NO. 999999
  • 15 Dec 2010 — OPPOSITION INSTITUTED NO. 999999
  • 07 Sept 2010 — EXTENSION OF TIME TO OPPOSE RECEIVED
  • 17 Aug 2010 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 17 Aug 2010 — PUBLISHED FOR OPPOSITION
  • 14 Jul 2010 — LAW OFFICE PUBLICATION REVIEW COMPLETED
  • 12 Jul 2010 — APPROVED FOR PUB - PRINCIPAL REGISTER

View this trademark record on Marksy