C5H DUALSHIELD

Live / Applied — Non-final action mailed (as of 01 Sept 2026)

What this means for you

Not registered yet, but its 11 Dec 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79451454
Mark type
Design + words
Filed
11 Dec 2025

Goods and services

  • Class 006 — Metal goods: Building materials of metal, in particular metal profiles, anchoring units for metal profiles, mounting parts, consoles, fasteners, fittings of metal for building, clips of metal for cables and pipes, ironmongery, small items of metal hardware; materials for use in the assembly of sanitary installations, fittings of metal for buildings, and ironmongery and small items of metal hardware for shipbuilding; frames of metal for building; steel buildings; buildings, transportable, of metal; posts of metal; stringers [parts of staircases] of metal; fastening devices of metal for air, gas and/or liquid conduits, in particular pipe shells and other pipe holders for installation construction; tension links; fastening devices of metal for electric cables; fasteners and beams of metal for air ducts, in particular brackets and suspended fasteners; hinges of metal; spring locks; screws of metal; goods of metal, included in class 6, namely support systems for pipelines; none of the aforesaid goods in connection with wire or welding wire of metal.
  • Class 037 — Building construction and repair services: Rustproofing; painting of metal surfaces to prevent corrosion; painting of surfaces to prevent corrosion.
  • Class 040 — Treatment of materials: Treatment of metal parts to prevent corrosion; treatment and coating of metal surfaces; application of wear resistant coatings to engineering components; application of wear-resistant coatings on metals and plastics; treatment of metal parts to prevent corrosion using hot-dip galvanizing and powder coating processes.

Owner

Prosecution history

  • 17 Sept 2026 — REFUSAL PROCESSED BY IB
  • 01 Sept 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 01 Sept 2026 — REFUSAL PROCESSED BY MPU
  • 23 Jun 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 22 Jun 2026 — NON-FINAL ACTION WRITTEN
  • 16 Jun 2026 — ASSIGNED TO EXAMINER
  • 15 Jun 2026 — APPLICATION FILING RECEIPT MAILED
  • 15 Jun 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 11 Jun 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy