ZARVIT
Live / Applied — Non-final action mailed (as of 08 Sept 2026)
What this means for you
Not registered yet, but its 18 Mar 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79450684
- Mark type
- Stylized text
- Filed
- 18 Mar 2026
Goods and services
- Class 006 — Metal goods: Framework of metal for construction; frames of metal for building; door frames of metal; profiles of metal for doors; door frames (casings) of metal; window frames (sashes) of metal; window sills of metal.
- Class 019 — Non-metallic building materials: Non-metallic construction materials; non-metallic lining coatings for construction; frames not of metal for building; door frames (casings) not of metal; non-metallic profiles for building construction; door and window frames of plastic and wood; window frames not of metal; door frames of wood.
- Class 037 — Building construction and repair services: Construction; installation and repair services; installation of windows; installation of doors and windows; installation and repair of window frames; installation and repair of door frames.
Owner
- SIGA Services AG, CH
Prosecution history
- 08 Sept 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 08 Sept 2026 — REFUSAL PROCESSED BY MPU
- 25 Jun 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 24 Jun 2026 — NON-FINAL ACTION WRITTEN
- 23 Jun 2026 — ASSIGNED TO EXAMINER
- 01 Jun 2026 — APPLICATION FILING RECEIPT MAILED
- 01 Jun 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 28 May 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB