IKENGA

Live / Applied — Non-final action mailed (as of 06 Sept 2026)

What this means for you

Not registered yet, but its 22 Jan 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79447318
Mark type
Design + words
Filed
22 Jan 2026

Goods and services

  • Class 009 — Scientific and electric apparatus: Energy storage units (batteries and accumulators); battery-based electrical power storage systems; software for the management and control of power grids; software for controlling energy storage systems; software for ensuring the quality of the energy supplied to the power grid; software based on blockchain technology and artificial intelligence for automatically controlling the quality of the energy supplied to the electrical grid by batteries; software based on blockchain technology and artificial intelligence for managing the efficient use of computing resources in an electrical grid; electrical controllers for power grid applications.
  • Class 042 — Scientific and technological services: Software as a service; development and design of software as a service; software development and design services; software development and design services for energy quality management; software development and design services for energy storage systems; software development and design services for electrical grid management and control; software design and development services based on blockchain technology and artificial intelligence for automatically controlling the quality of the energy supplied to the power grid by batteries; software design and development services based on blockchain technology and artificial intelligence for managing the efficient use of computing resources in a power grid; engineering services for power grids; remote monitoring services for electrical energy storage systems; design and development services for software to increase computing capacity without physical servers managing databases and information systems.

Owner

Prosecution history

  • 06 Sept 2026 — REFUSAL PROCESSED BY MPU
  • 27 May 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 26 May 2026 — NON-FINAL ACTION WRITTEN
  • 19 May 2026 — ASSIGNED TO EXAMINER
  • 03 Apr 2026 — APPLICATION FILING RECEIPT MAILED
  • 03 Apr 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 02 Apr 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy