Serial 79446987
Live / Applied — Non-final action mailed (as of 17 Aug 2026)
What this means for you
Not registered yet, but its 23 Feb 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79446987
- Mark type
- Design / logo
- Filed
- 23 Feb 2026
Goods and services
- Class 006 — Metal goods: Fixing devices of metal; brackets of metal for furniture; fittings of metal for furniture; cupboard fittings of metal; metal joinery fittings; latches (metal -) being fittings for doors; knobs of metal; metal handles; drawer handles of metal; metal handles for cabinets; hinges of metal; door hinges of metal; window hinges of metal; hooks [metal hardware]; lugs of metal; screw threaded fasteners of metal; rail fastenings of metal; door holding devices of metal; rails of metal; ironwork for doors; door fittings of metal; gratings of metal; metal casters; screws of metal; shelf supports of metal [other than parts of furniture]; shelf dividers of metal [other than parts of furniture]; metal decorative boxes; roller doors of metal; drawer sliders of metal; shaped metal sections; ventilation grilles of metal for fitting in doors; ventilation grilles of metal for fitting in windows; metal vent covers; tracks [rails] of metal; steel rails; metal brackets.
- Class 009 — Scientific and electric apparatus: Electric sockets; surge boards; water leakage detection alarms; water level detection apparatus; sensors; electronic sensors; current breakers; electric breakers [switches]; electrical terminal blocks; terminal blocks (electrical connecting -); electrical power extension cords; distribution boxes [electricity]; branch boxes [electricity].
- Class 011 — Environmental control apparatus: Luminaires; lighting apparatus; lighting installations; lighting armatures; LED lighting fixtures; electric light fittings; spotlights; control units [thermostatic valves] for heating installations.
Owner
Prosecution history
- 10 Sept 2026 — REFUSAL PROCESSED BY IB
- 18 Aug 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 17 Aug 2026 — REFUSAL PROCESSED BY MPU
- 16 Jun 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 15 Jun 2026 — NON-FINAL ACTION WRITTEN
- 11 Jun 2026 — ASSIGNED TO EXAMINER
- 13 Apr 2026 — APPLICATION FILING RECEIPT MAILED
- 13 Apr 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 08 Apr 2026 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
- 26 Mar 2026 — SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB