RENEXT SOLUTIONS
Live / Applied — Non-final action written — not yet mailed (as of 21 Mar 2026)
What this means for you
Not registered yet, but its 29 Sept 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79445957
- Mark type
- Stylized text
- Filed
- 29 Sept 2025
Goods and services
- Class 037 — Building construction and repair services: Construction, installation, maintenance and repair services for energy production and supply installations; maintenance and repair of energy generating installations
- Class 040 — Treatment of materials: Energy treatment services; generation and transformation of electricity from solar, photovoltaic and wind energy; advisory and information services related to the above services in the field of generation, operation and use of systems, structures and installations of power supply and energy transmission networks, electrical energy and electricity
- Class 042 — Scientific and technological services: Technological advisory, technological design, engineering, research, development, exploration services in the geological, energy, gas and petroleum fields
Owner
Prosecution history
- 22 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 21 Mar 2026 — NON-FINAL ACTION WRITTEN
- 21 Mar 2026 — ASSIGNED TO EXAMINER
- 20 Mar 2026 — APPLICATION FILING RECEIPT MAILED
- 20 Mar 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 19 Mar 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB