GRAND HITEK

Live / Allowed — Publication / registration review complete (as of 09 Sept 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 29 Sept 2025 filing date already counts against anyone who files later.

Record

Serial number
79445688
Mark type
Word mark
Filed
29 Sept 2025
Published for opposition
29 Sept 2026
Attorney of record
He Li

Goods and services

  • Class 006 — Metal goods: Cast iron, unwrought or semi-wrought; common metals, unwrought or semi-wrought; titanium, unwrought or semi-wrought; cermets; washers of metal.
  • Class 007 — Machines and machine tools: Vacuum pumps being machines; pumps for machines; screw pumps; reciprocating vacuum pumps.
  • Class 011 — Environmental control apparatus: Gas purifying apparatus for semiconductor industrial waste gas treatment; cooling appliances and installations for cooling gas; gas scrubbers apparatus for semiconductor industrial waste gas treatment; gas scrubbing apparatus; air filtering installations; air purifying apparatus and machines; air handlers; air filters for industrial use; gas purification installations; air purifying units for industrial use.
  • Class 017 — Rubber goods: Gaskets; washers of rubber or vulcanized fibre; joint packings for pipes.
  • Class 037 — Building construction and repair services: Repair or maintenance of machines and systems for manufacturing semiconductors; rebuilding machines that have been worn or partially destroyed; pump repair; pump repair and maintenance; rental of drainage pumps; repair or maintenance of integrated circuits manufacturing machines and systems; repair or maintenance of air-conditioning apparatus for industrial purposes; rebuilding engines that have been worn or partially destroyed; pump repair or maintenance.

Owner

Prosecution history

  • 20 Aug 2026 — NOTIFICATION PROCESSED BY IB
  • 18 Aug 2026 — WITHDRAWN FROM PUB - OG REVIEW QUERY
  • 05 Aug 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 05 Aug 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
  • 24 Jul 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 24 Jul 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 23 Jul 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 23 Jul 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 14 May 2026 — REFUSAL PROCESSED BY IB
  • 29 Apr 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 28 Apr 2026 — REFUSAL PROCESSED BY MPU
  • 19 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 19 Mar 2026 — NON-FINAL ACTION WRITTEN
  • 16 Mar 2026 — ASSIGNED TO EXAMINER
  • 15 Mar 2026 — APPLICATION FILING RECEIPT MAILED

View this trademark record on Marksy