SOLAREAST
Live / Allowed — Publication / registration review complete (as of 28 Aug 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 07 Jul 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79444721
- Mark type
- Design + words
- Filed
- 07 Jul 2025
- Published for opposition
- 15 Sept 2026
- Attorney of record
- Zixiu Wu
Goods and services
- Class 007 — Machines and machine tools: Aerocondensers being air-cooled condensers; pumps for machines for heating installations; pumps for machines; compressed air pumps; food processors, electric; fruit presses, electric, for household purposes; electric food processors; dishwashing machines for household purposes; wind power generation equipment, namely, wind-powered electricity generators; hydroelectric power generation equipment, namely, hydroelectric generators
- Class 009 — Scientific and electric apparatus: High tension batteries; batteries, electric; accumulators, electric; photovoltaic cells; solar batteries; all-solid-state batteries; lithium secondary batteries; photovoltaic inverters; solar panels for the production of electricity; auxiliary battery packs; electrical terminal boxes; Electricity distribution consoles; electrical switchgear, namely, voltage boosting devices for electric power lines; accumulators, electric, for vehicles; batteries, electric, for vehicles; charging stations for electric vehicles; electric car charging piles; electric control devices for energy management
- Class 011 — Environmental control apparatus: Heat pumps; air-source heat pump water heaters; pressure water tanks, namely, hot water tanks; expansion tanks for central heating installations; air-conditioning units; solar water heaters; solar collectors for heating; water-saving toilets; showers; water purification installations; water purifying apparatus and machines; water softening apparatus and installations
Owner
Prosecution history
- 09 Sept 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 18 Aug 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 03 Aug 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 03 Aug 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 03 Aug 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 04 Jun 2026 — REFUSAL PROCESSED BY IB
- 20 May 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 20 May 2026 — REFUSAL PROCESSED BY MPU
- 01 Apr 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 31 Mar 2026 — NON-FINAL ACTION WRITTEN
- 22 Mar 2026 — ASSIGNED TO EXAMINER
- 21 Mar 2026 — APPLICATION FILING RECEIPT MAILED
- 21 Mar 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 20 Mar 2026 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
- 26 Feb 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB