A
Live / Allowed — Publication / registration review complete (as of 10 Sept 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 16 Dec 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79444610
- Mark type
- Design + words
- Filed
- 16 Dec 2025
- Published for opposition
- 29 Sept 2026
- Attorney of record
- Tomohiro Mori
Goods and services
- Class 006 — Metal goods: Hanging hooks of metal; clothes hooks of metal; exhibition hooks of metal; wire ropes; hardware of metal, namely, wall mounts, floor mounts and ceiling mounts for use in displays, hangers, brackets, screws, nuts, clamps, pulleys, tension links, carabiners and cable clips, all of metal; metal joinery fittings; metal material for building purpose or construction purpose, namely, frameworks of metal, metal conduit, pipes and tubes of metal, prefabricated metal platforms, metal shelf structures in the nature of metal shelf brackets, construction elements made of metal, namely, braces, supports and shores; outdoor blinds of metal; slide rails of metal; rails of metal; fasteners of metal, namely, mechanical fastening elements of metal, metal threaded fasteners, and metal fastening anchors for securing displays to floors, walls and ceilings; fittings of metal for shelf support; hardware of metal for gripping wire ropes, namely, position adjustable wire rope clasps for hanging and displaying articles, goods, exhibits, art objects and decorations; balustrades of metal; bindings of metal for tightening rope; brackets of metal for building; cable joints of metal, non-electric; cable linkages of metal, non- electric.
Owner
- A.G.K., LTD., JP
Prosecution history
- 03 Sept 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 03 Sept 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 03 Sept 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 03 Sept 2026 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 21 Jul 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 21 Jul 2026 — FINAL REFUSAL E-MAILED
- 21 Jul 2026 — FINAL REFUSAL WRITTEN
- 30 Jun 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 30 Jun 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 30 Jun 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 25 Jun 2026 — REFUSAL PROCESSED BY IB
- 05 Jun 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 05 Jun 2026 — REFUSAL PROCESSED BY MPU
- 21 Apr 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 20 Apr 2026 — NON-FINAL ACTION WRITTEN