ASAPLUS TECHNOLOGY
Live / Applied — Non-final action mailed (as of 28 Mar 2026)
What this means for you
Not registered yet, but its 15 Sept 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79443237
- Mark type
- Stylized text
- Filed
- 15 Sept 2025
Goods and services
- Class 009 — Scientific and electric apparatus: Control, monitoring, regulating and measuring apparatus for heating, ventilating, air conditioning and refrigerating installations, that is electrical control panels, electric control apparatus; testers for heating/combustion, ventilating, air conditioning and refrigerating installations, as far as not included in other classes, that is scanners; flame protection apparatus, that is fire extinguishing apparatus, sprinkler systems for fire protection; safety alarm apparatus and fire alarms; electrical and electronic apparatus and instruments for data acquisition and control; autonomous apparatus for warning and protection for water and fire damage; fire alarm devices; fire detection installations and alarm systems; downloadable software and computers; interactive software; application software for mobile communications apparatus.
- Class 037 — Building construction and repair services: Assembly, maintenance and repair of installations, devices and apparatus, in particular in the field of buildings technology and technical management of buildings.
- Class 042 — Scientific and technological services: Technical planning, research and technical development of installations, devices and apparatus, in particular in the field of buildings technology and technical management of buildings; technical advice and technical expertise concerning installations, devices and apparatus in the field of buildings technology and technical management of buildings; creation and rental of programs for data processing and process technology; technical project management in the field of buildings technology and technical management of buildings; design and development of computer hardware and software; technical project planning; technical project management in the field of computing; computer programming services; installation and maintenance of software.
Owner
Prosecution history
- 16 Apr 2026 — REFUSAL PROCESSED BY IB
- 28 Mar 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 28 Mar 2026 — REFUSAL PROCESSED BY MPU
- 01 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 28 Feb 2026 — NON-FINAL ACTION WRITTEN
- 16 Feb 2026 — ASSIGNED TO EXAMINER
- 15 Feb 2026 — APPLICATION FILING RECEIPT MAILED
- 15 Feb 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 12 Feb 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB