AJUNGILAK
Live / Applied — Non-final action mailed (as of 27 Mar 2026)
What this means for you
Not registered yet, but its 23 Sept 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79441209
- Mark type
- Stylized text
- Filed
- 23 Sept 2025
Goods and services
- Class 018 — Leather goods: Backpacks, satchels, sports bags, suitcases, bags, namely, athletic bags, roll bags, messenger bags, tote bags, multi-purpose handbags, hiking bags, empty tool bags and traveling bags
- Class 020 — Furniture: Mattresses, namely mattresses for camping, insulating mattresses, sleeping mattresses; insulating flor mats for sleeping, pillows and cushions
- Class 024 — Fabrics: Bed blankets, namely, quilts, bed clothes, bed linen, covers for cushions, mattress covers; sleeping bags; sleeping bag sheets, bivouac bags, namely, bivouac sacks being covers for sleeping bags; sleeping bag liners; mosquito nets
- Class 025 — Clothing: Clothing, namely, jackets, pullovers, sweaters, trousers, pants, shorts, overalls, shirts, T-shirts, vests, underwear, tights, neck gaiters, leg gaiters, boot gaiters; sportswear, namely, sports jackets, sports pullovers, sports sweaters, sports trousers, sports pants, sports shorts, sports shirts, sports T-shirts; leisure wear, namely, bandanas, beanies, headbands, and caps being headwear; functional underwear; tee-shirts; shirts; hiking trousers; climbing pants; tights for sports; rainwear; gloves; scarves; clothing for skiing, namely, skiing jackets, skiing pullovers; skiing pants, skiing gloves; raincoats; ear muffs; clothing belts; socks; shoes; hiking boots; mountaineering boots; casual shoes; climbing shoes; outdoor shoes; ski boots; sports shoes; headwear; hats; hosiery
Owner
Prosecution history
- 27 Mar 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 27 Mar 2026 — REFUSAL PROCESSED BY MPU
- 12 Mar 2026 — CORRECTION TRANSACTION RECEIVED FROM IB
- 25 Feb 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 24 Feb 2026 — NON-FINAL ACTION WRITTEN
- 19 Feb 2026 — CORRECTION TRANSACTION RECEIVED FROM IB
- 12 Feb 2026 — ASSIGNED TO EXAMINER
- 10 Feb 2026 — APPLICATION FILING RECEIPT MAILED
- 10 Feb 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 09 Feb 2026 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
- 08 Jan 2026 — SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB