HYGEN
Live / Applied — Non-final action mailed (as of 31 Mar 2026)
What this means for you
Not registered yet, but its 10 Oct 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79441093
- Mark type
- Stylized text
- Filed
- 10 Oct 2025
Goods and services
- Class 007 — Machines and machine tools: Power generators; power installations [generators]; power supply apparatus [generators]; internal combustion engines for power generation; powertrains and parts of powertrains [except for land vehicles].
- Class 009 — Scientific and electric apparatus: Electricity storage devices; regulated power supply apparatus; scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, life-saving and teaching apparatus and instruments for the generation, conversion, and supply of energy; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus and instruments for recording, transmitting, reproducing or processing data in the field of energy generation, conversion, and supply; monitoring, control, regulating and switching devices, in particular control systems for engines, especially hydrogen-powered engines; energy storage apparatus, namely devices and instruments for storing electricity; accumulators; batteries, electric, for vehicles; sensors for instrumentation; monitoring and diagnostic equipment and systems for engine and drivetrain in vehicles.
- Class 012 — Vehicles: Vehicles; apparatus for locomotion by land, air or water; motor vehicles; commercial vehicles; land vehicles, hybrid vehicles; plug-in hybrid cars; electrically powered motor vehicles; hydrogen-powered automobiles; hydrogen-powered land vehicles and means of transport; drive units for land vehicles; powertrains, including engines and motors, for land vehicles.
- Class 037 — Building construction and repair services: Maintenance, servicing and repair of power generating apparatus and devices; installation of power generating apparatus- and devices.
- Class 040 — Treatment of materials: Power generating; generation of electrical power.
- Class 042 — Scientific and technological services: Engineering services in the field of electrical power and natural gas generation; scientific and technological services, research and design relating services in the field of energy generation, conversion, and supply, in particular using hydrogen; industrial analysis and research services in the field of energy generation, conversion, and supply, in particular using hydrogen; design and development of computer hardware and computer software for monitoring devices, apparatus, instruments and systems for the generation, conversion and supply of energy and for the procurement, logistics and handling of hydrogen; engineering research; development and research work in the field of hybrid vehicles, in particular in the field of powertrains for hybrid vehicles; technical project studies in the field of hybrid vehicles, in particular hybrid vehicles with hydrogen-powered combustion engines; technological consulting; technical and scientific feasibility studies in the field of hydrogen production, storage and use; development of technologies for alternative vehicle drives; engineering services in the field of energy generation, conversion, and supply; data analysis [scientific and technological services] in the field of energy production, conversion, and supply, in particular using hydrogen; technological services in the field of hybrid vehicle construction; technical project management in the field of energy generation, conversion, and supply energy, in particular using hydrogen; design, development and creation of data processing programs for monitoring devices, apparatus, instruments, and systems for the generation, conversion, and supply of energy and for the procurement, logistics, and handling of hydrogen.
Owner
Prosecution history
- 31 Mar 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 31 Mar 2026 — REFUSAL PROCESSED BY MPU
- 03 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 02 Mar 2026 — NON-FINAL ACTION WRITTEN
- 27 Feb 2026 — ASSIGNED TO EXAMINER
- 12 Jan 2026 — APPLICATION FILING RECEIPT MAILED
- 12 Jan 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 08 Jan 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB