TEP TRANSFORMER EXPLOSION PREVENTION LLC
Live / Allowed — Publication / registration review complete (as of 10 Sept 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 17 Oct 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79439076
- Mark type
- Design + words
- Filed
- 17 Oct 2025
- Published for opposition
- 29 Sept 2026
- Attorney of record
- Sarah W. Matthews
Goods and services
- Class 009 — Scientific and electric apparatus: Checking and life-saving apparatus and instruments, and particularly apparatus for protecting transformers against explosions and fires, namely, electrical devices in the nature of surge protectors, electric switches, pressure relief valves, and overpressure release devices for transformer tanks, onload tap changers, bushing oil cable boxes and turrets, for controlling explosions and fires in transformers; fire extinguishing apparatus; apparatus for detecting fire in and around electrical power transformers; sensors for measuring pressure, temperature, and flow of fluids; electrical and electronic security and alarm apparatus and instruments for protecting against explosions and fires, particularly flashing safety indicator lights, sirens, electric warning indicator lights and bells, signaling lights, and luminous beacons; electric and electronic apparatus, instruments and equipment for receiving, conducting, switching, transforming, accumulating, regulating or controlling electrical energy, particularly transformers, explosion-proof apparatus, instruments and equipment, namely, electrical switch housings and electrical connector housings; housings adapted for signal splitters for electronic apparatus; housings adapted for electric control panels; housings adapted for electronic monitors and monitor modules for monitoring electric current and electrical signals; housings adapted for electric disconnect switches; housings adapted for pressure relief valves for transformers; downloadable electronic publications in the nature of books, manuals, and articles in the field of electrical safety equipment and fire and explosion prevention and control
- Class 037 — Building construction and repair services: Installation, repair and maintenance of valves for remote closing by fluid flow and by pressure difference; installation, repair and maintenance of dangerous gas extraction apparatus; installation, repair and maintenance of apparatus for protection of transformers against fire and explosions; installation, repair and maintenance of fire extinguishing apparatus; installation, repair and maintenance of apparatus for detection of fire and combustible, flammable, and hazardous gases in and around electrical power transformers; installation, repair and maintenance of sensors for measuring pressure, temperature, and flow of fluids; installation, repair and maintenance of gas injectors; installation, repair and maintenance of apparatus for cooling transformers that cools by mixing and stirring transformer oil and cooling fluid; installation, repair and maintenance of electric and electronic security and alarm instruments for protecting against explosion, fire and over-pressure; installation, repair and maintenance of electric and electronic apparatus, instruments and equipment for receiving, conducting, switching, transforming, accumulating, regulating or controlling electric power
Owner
- Philippe Magnier, FR
Prosecution history
- 03 Sept 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 03 Sept 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 03 Sept 2026 — EXAMINER'S AMENDMENT ENTERED
- 03 Sept 2026 — EXAMINERS AMENDMENT E-MAILED
- 03 Sept 2026 — EXAMINERS AMENDMENT -WRITTEN
- 17 Aug 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 17 Aug 2026 — FINAL REFUSAL E-MAILED
- 17 Aug 2026 — FINAL REFUSAL WRITTEN
- 17 Jul 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 17 Jul 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 17 Jul 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 07 May 2026 — REFUSAL PROCESSED BY IB
- 23 Apr 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 23 Apr 2026 — REFUSAL PROCESSED BY MPU
- 13 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW