MOONWATT

Live / Allowed — Published for opposition (as of 21 Jul 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 01 Nov 2025 filing date already counts against anyone who files later.

Record

Serial number
79438908
Mark type
Stylized text
Filed
01 Nov 2025
Published for opposition
21 Jul 2026
Attorney of record
Alexander Lazouski

Goods and services

  • Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, distributing, transforming, storing, regulating, and controlling electricity in the nature of electrical controlling devices; energy storage systems primarily comprising batteries for stationary applications; electric batteries, including those based on sodium-ion and lithium-ion technologies; batteries for energy storage installations; battery management systems (BMS) primarily comprised of batteries; battery chargers; power electronic systems for the conversion of energy in the nature of electric converters; solar inverters; hybrid inverters for solar and storage power plants; electric control devices for energy management and solar installations; downloadable software for energy management and control; downloadable software for optimizing the storage, usage, and distribution of renewable energy; measuring, monitoring, and control devices in the nature of electrical controlling devices for energy storage systems; electric energy monitoring sensors; downloadable computer software for managing and integrating energy storage systems with solar power installations; downloadable digital computer software platforms for real-time monitoring and control of renewable energy systems; data acquisition and analysis tools in the nature of data processing equipment for energy infrastructure
  • Class 037 — Building construction and repair services: Installation, maintenance, and repair of energy storage systems and related infrastructure, including systems based on sodium-ion and lithium-ion battery technologies; installation and servicing of solar inverters and hybrid solar-storage inverters; installation, maintenance and repair of solar power plants and apparatus and equipment for the generation of renewable energy; installation, maintenance and repair of energy systems and infrastructure; installation, maintenance and servicing of stationary energy storage systems and related power electronic apparatus
  • Class 042 — Scientific and technological services: Design and development of energy storage systems and renewable energy systems; scientific and industrial research in the fields of battery storage and renewable technologies, including sodium-ion and lithium-ion battery technologies; development of technology, namely, solar inverters, battery inverters and hybrid inverters for integrated solar and storage systems; development of software for energy management, storage, and distribution; software engineering optimized for co-located solar and storage installations; technological consultancy in the field of the energy transition; consulting services for integrating energy storage into renewable energy infrastructure; technical consulting in the nature of technical assessment and analysis of energy systems; engineering services relating to electricity storage, smart grids, and renewable integration; design, development and commercialization in the nature of new product design of battery management systems (BMS) and energy management systems (EMS) firmware and software; provision of cloud-based platforms in the nature of providing virtual computer systems through cloud computing for monitoring and controlling distributed energy systems; technical support, namely, help desk services for energy infrastructure

Owner

Prosecution history

  • 08 Sept 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 08 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
  • 21 Jul 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 21 Jul 2026 — PUBLISHED FOR OPPOSITION
  • 15 Jul 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 24 Jun 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 11 Jun 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 11 Jun 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 11 Jun 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 11 Jun 2026 — REFUSAL PROCESSED BY IB
  • 23 May 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 23 May 2026 — REFUSAL PROCESSED BY MPU
  • 08 Apr 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 07 Apr 2026 — NON-FINAL ACTION WRITTEN
  • 16 Mar 2026 — ASSIGNED TO EXAMINER

View this trademark record on Marksy