GR POWER
Live / Applied — Non-final action written — not yet mailed (as of 06 Mar 2026)
What this means for you
Not registered yet, but its 08 Oct 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79438784
- Mark type
- Word mark
- Filed
- 08 Oct 2025
Goods and services
- Class 039 — Transportation and storage services: Electrical energy supply; electricity transport and storage services; services for the distribution, supply and transmission of energy; electricity distribution and supply services; information and advisory services regarding energy distribution and supply; consultancy services regarding energy distribution and supply; storage, transport, distribution and supply of electrical energy, gas and water; supply of heating [distribution]; distribution of energy for heating and cooling buildings; rental of power lines to third parties for electricity transmission; rental of apparatus for conducting, switching and accumulating electricity; energy and water supply company services; supply of energy, electricity, heating, gas or water to consumers; grouping of electric current, heating, gas or water obtained from generation of energy from wind power installations, hydraulic power plants, biomass installations, biogas installations, geothermal power plants, photovoltaic installations or cogeneration plants.
Owner
Prosecution history
- 07 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 06 Mar 2026 — NON-FINAL ACTION WRITTEN
- 25 Feb 2026 — ASSIGNED TO EXAMINER
- 08 Jan 2026 — NEW REPRESENTATIVE AT IB RECEIVED
- 12 Dec 2025 — APPLICATION FILING RECEIPT MAILED
- 12 Dec 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 11 Dec 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB