DTEK
Live / Applied — Non-final action mailed (as of 02 Mar 2026)
What this means for you
Not registered yet, but its 12 Sept 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79438602
- Mark type
- Word mark
- Filed
- 12 Sept 2025
Goods and services
- Class 004 — Lubricants and fuels: Anthracite; natural gas; solidified gases (fuel); electrical energy; ethanol (fuel); coal; coke; mazut; petroleum, raw or refined; oil-gas; fuel gas; hydrogen fuel
- Class 037 — Building construction and repair services: Drilling of deep oil or gas wells; drilling of wells; mining extraction; vehicle battery charging; charging of electric vehicles; hydraulic fracturing services; fracking services; natural gas refuelling services for motor vehicles; rental of portable power chargers; rental of battery chargers; repair of power lines; pipeline construction and maintenance
- Class 039 — Transportation and storage services: Electricity distribution; distribution of energy
- Class 040 — Treatment of materials: Production of renewable green energy; production of energy; destruction of waste and trash; waste treatment (transformation); processing of oil; recycling of waste and trash; upcycling [waste recycling]; rental of batteries; rental of electricity generators
- Class 042 — Scientific and technological services: Analysis for oil-field exploitation; geological test drilling; oil-well testing; geological surveys; geological prospecting; scientific research in the field of environmental protection; providing scientific information, advice and consultancy relating to carbon offsetting; providing scientific information, advice and consultancy relating to net zero emissions; consultancy in the field of energy-saving; exploration services in the field of the oil, gas and mining industries
Owner
Prosecution history
- 19 Mar 2026 — REFUSAL PROCESSED BY IB
- 02 Mar 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 02 Mar 2026 — REFUSAL PROCESSED BY MPU
- 03 Feb 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 02 Feb 2026 — NON-FINAL ACTION WRITTEN
- 26 Jan 2026 — ASSIGNED TO EXAMINER
- 08 Dec 2025 — APPLICATION FILING RECEIPT MAILED
- 08 Dec 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 04 Dec 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB