Serial 79437572

Live / Applied — Non-final action written — not yet mailed (as of 09 Mar 2026)

What this means for you

Not registered yet, but its 22 Sept 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79437572
Mark type
Design / logo
Filed
22 Sept 2025

Goods and services

  • Class 004 — Lubricants and fuels: Electrical energy; electrical energy from renewable sources; electrical energy from solar power; electrical energy from wind power
  • Class 039 — Transportation and storage services: Distribution of renewable energy; distribution and transmission of electricity; storage of electricity; storage of energy and fuels; providing information relating to the distribution of electricity; electricity distribution; distribution of energy
  • Class 040 — Treatment of materials: Generation of electricity from wind energy; generation of power; consultancy services relating to the generation of electrical power; production of electrical energy from renewable sources; production of renewable green energy
  • Class 042 — Scientific and technological services: Engineering; engineering design; engineering consultancy; construction design; design services for the construction industry; structural engineering design services; engineering services for the design of structures; engineering project management services; inspection of plant and machinery; quality assurance services; monitoring of activities which influence the environment within civil engineering structures; design and development of software for control, regulation and monitoring of solar energy systems; scientific research in the field of renewable energy, all of the aforementioned services being provided in the field of renewable energy development

Owner

Prosecution history

  • 10 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 09 Mar 2026 — NON-FINAL ACTION WRITTEN
  • 05 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
  • 05 Feb 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 04 Feb 2026 — NON-FINAL ACTION WRITTEN
  • 29 Jan 2026 — ASSIGNED TO EXAMINER
  • 01 Jan 2026 — NEW REPRESENTATIVE AT IB RECEIVED
  • 04 Dec 2025 — APPLICATION FILING RECEIPT MAILED
  • 04 Dec 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 01 Dec 2025 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
  • 27 Nov 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy