ENGINEERING FUTURE.
Live / Applied — Non-final action mailed (as of 13 Mar 2026)
What this means for you
Not registered yet, but its 26 Sept 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79437103
- Mark type
- Word mark
- Filed
- 26 Sept 2025
Goods and services
- Class 007 — Machines and machine tools: Construction machines, in particular machines for the manufacture, transport and conveying of concrete and mortar; concrete mixing and transport equipment, in particular attachments for truck mixers mounted on road-going chassis; pumps for concrete, in particular concrete pumps mounted on road-going chassis and concrete pumps mounted on lorry chassis; thick-matter pumps for conveying slurry; double-cylinder pumps (machines) for dense matter and articulated junctions, pipe junctions, articulated pipes and wearing rings being parts of the aforesaid pumps; conveyor pumps (machines) for dense matter; hydraulic controllers for machines and parts of machines, in particular for processing and conveying of concrete and mortar; mixers for concrete and mortar; including all the aforesaid goods with attached concrete distribution masts; mobile concrete pumps being building site pumps; distributor masts being parts of concrete conveying machines.
- Class 009 — Scientific and electric apparatus: Electrohydraulic and electrical controllers and measuring apparatus and electric regulators and control apparatus for machines and parts of machines, in particular for processing and conveying of concrete and mortar.
- Class 012 — Vehicles: Vehicles, including in particular vehicles for mixing, conveying and distributing of concrete and mortar.
- Class 042 — Scientific and technological services: Engineering services.
Owner
- Schwing GmbH, XP
Prosecution history
- 02 Apr 2026 — REFUSAL PROCESSED BY IB
- 13 Mar 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 13 Mar 2026 — REFUSAL PROCESSED BY MPU
- 11 Feb 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 10 Feb 2026 — NON-FINAL ACTION WRITTEN
- 02 Feb 2026 — ASSIGNED TO EXAMINER
- 16 Nov 2025 — APPLICATION FILING RECEIPT MAILED
- 16 Nov 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 13 Nov 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB