ETAEDGE
Live / Applied — Non-final action mailed (as of 02 Feb 2026)
What this means for you
Not registered yet, but its 15 Aug 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79436829
- Mark type
- Stylized text
- Filed
- 15 Aug 2025
Goods and services
- Class 009 — Scientific and electric apparatus: Internet of things [IoT] gateways; internet of things [IoT] sensors; computer hardware modules for use in electronic devices using the internet of things [IoT]; apparatus and instruments for regulating electricity; energy control devices; electric control devices for energy management; apparatus for improving power efficiency; apparatus and instruments for switching electricity; energy regulators; software for the planning, integration and optimization of smart city applications; optimisation software; computer software for communication between computers over a local network; apparatus for the transmission of data; apparatus for the transmission of data; computer hardware for remotely accessing and transmitting data; downloadable computer software for the transmission of data; apparatus for the transmission of data; downloadable computer software for the transmission of information; apparatus for the transmission of data; intelligent gateways for software defined storage; intelligent gateways for real- time data analysis; intelligent gateways for data pre-processing; intelligent gateways for communication; machine learning software for analysis; machine learning software; artificial intelligence software for analysis; artificial intelligence software; cloud computing software; automatic control apparatus; electrical remote control apparatus; audio-sensitive controls for lighting apparatus and instruments; process controlling software.
Owner
- etalytics GmbH, DE
Prosecution history
- 19 Feb 2026 — REFUSAL PROCESSED BY IB
- 02 Feb 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 02 Feb 2026 — REFUSAL PROCESSED BY MPU
- 06 Jan 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 05 Jan 2026 — NON-FINAL ACTION WRITTEN
- 30 Dec 2025 — ASSIGNED TO EXAMINER
- 14 Nov 2025 — APPLICATION FILING RECEIPT MAILED
- 14 Nov 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 13 Nov 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB