CD AUTOMATION
Live / Applied — Non-final action mailed (as of 13 Mar 2026)
What this means for you
Not registered yet, but its 30 Sept 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79436700
- Mark type
- Word mark
- Filed
- 30 Sept 2025
Goods and services
- Class 009 — Scientific and electric apparatus: SCR power regulators; thyristor power regulators; AC power converters; AC switches; solid-state relays; temperature regulators; communication ports; fieldbus communication terminal units; operator interfaces (HMI); configuration software; general electronic and electrical components; regulating apparatus, electric; converters, electric; switches, electric; limiters [electricity]; relays, electric; remote checkers; electric light regulators; lighting ballasts; control units for electrical power and controllers thereof; heat regulating apparatus; electrical plants for the remote control of industry; electric apparatus for commutation; distribution consoles [electricity]; electricity control panels; inverters [electricity]; industrial automation controls and controls for power station automation.
Owner
Prosecution history
- 02 Apr 2026 — REFUSAL PROCESSED BY IB
- 13 Mar 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 13 Mar 2026 — REFUSAL PROCESSED BY MPU
- 10 Feb 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 09 Feb 2026 — NON-FINAL ACTION WRITTEN
- 04 Feb 2026 — ASSIGNED TO EXAMINER
- 14 Nov 2025 — APPLICATION FILING RECEIPT MAILED
- 14 Nov 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 13 Nov 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB