EPC VARICYCLE
Live / Allowed — Publication / registration review complete (as of 07 Sept 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 18 Jun 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79435355
- Mark type
- Stylized text
- Filed
- 18 Jun 2025
- Published for opposition
- 29 Sept 2026
- Attorney of record
- Pina Campagna
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable and recorded software for industrial process control and database management in the field of waste recycling; computer software packages, namely, downloadable and recorded software for industrial process control and database management in the field of waste recycling; downloadable software for industrial process control and database management in the field of waste recycling
- Class 035 — Advertising and business services: Operation of businesses for others, namely, business operation services; business administration for others; cost price analysis; organising and arranging of exhibitions and trade fairs for advertising purposes, all in the field of science; business organization and management consultancy; professional business consultancy; employment placement services, namely, personnel placement; business appraisals; conducting of economic feasibility studies; arranging of commercial and business contacts, namely, providing commercial and business contact information, via the internet; advertisement for others on the internet
- Class 037 — Building construction and repair services: Construction management; construction supervision; construction of industrial plants, maintenance of industrial plants, and servicing being maintenance and repair of industrial plants; renovation of industrial plants
- Class 042 — Scientific and technological services: Scientific and technological services, namely, research and design in the field of waste recycling technology; industrial analysis and research services, all in the field of waste recycling; services of engineering offices, namely, engineering services in relation to planning, constructing and commissioning of industrial plants and industrial buildings; chemical analysis; chemical laboratory services; preparation of technical reports, namely, conducting scientific feasibility studies and preparing engineering documentations being technical writing for others in the field of engineering and techno-economic feasibility; technological consultancy in the field of pollution detection and control technology, in particular in the field of waste recycling; services of an engineering office, namely, engineering services; design of architectural and engineering software; conversion of data or documents from physical to electronic media; development of databases; research and development of new products for third parties; chemical and mechanical engineering services, namely, development and planning of chemical technologies and mechanical, thermal and chemical processes in the field of waste recycling; software design, software engineering and software development and customizing computer software, all relating to systems involving highly viscous, non-newtonian fluids; development of software for the design and calculation of product lines in chemical plants; creating and updating of software databases; rental of computer programs for industrial process control and database management in the field of waste recycling; technological consultancy and information relating to the aforesaid services
Owner
Prosecution history
- 09 Sept 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 09 Sept 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 31 Aug 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 31 Aug 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 31 Aug 2026 — EXAMINER'S AMENDMENT ENTERED
- 31 Aug 2026 — EXAMINERS AMENDMENT E-MAILED
- 31 Aug 2026 — EXAMINERS AMENDMENT -WRITTEN
- 08 Jun 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 08 Jun 2026 — FINAL REFUSAL E-MAILED
- 08 Jun 2026 — FINAL REFUSAL WRITTEN
- 06 May 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 06 May 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 06 May 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 08 Jan 2026 — REFUSAL PROCESSED BY IB
- 21 Dec 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB