ZETA ECOCONNECT
Live / Applied — Non-final action mailed (as of 20 Jan 2026)
What this means for you
Not registered yet, but its 29 Jul 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79435272
- Mark type
- Design + words
- Filed
- 29 Jul 2025
Goods and services
- Class 006 — Metal goods: Tanks of metal; containers of metal for compressed gas or liquid air; closures of metal for containers; tubes of metal; pipes and tubes of metal; couplings of metal for tubing; junctions of metal for pipes; structural joint connectors of metal; strain relief clips of metal.
- Class 007 — Machines and machine tools: Linking devices [parts of machines]; linking mechanisms [parts of machines]; housings [parts of machines]; casings for industrial machines; electromechanical machines for chemical industry; electric driving motors for machines; motors, electric, other than for land vehicles; pressure reducers [parts of machines]; boiler tubes [parts of machines]; steam engine boilers; pumps [machines]; vacuum pumps [machines]; centrifugal pumps; filters being parts of machines; filters for machines; fittings for engine boilers; joints [parts of engines]; agitators; beaters, electric; mixers [machines]; suction machines for industrial purposes; control mechanisms for machines, engines or motors; compressors; compressors for refrigerators; steam engines; fluid separation machines; centrifugal machines; filter housings being parts of engines; filter housings being parts of machines; pipes [fitted parts of machines]; skimming machines.
- Class 017 — Rubber goods: Flexible hoses, not of metal; flexible tubes (non-metallic -) for the conducting of gaseous media; flexible tubes (non-metallic -) for the conducting of liquid media; flexible pipes, tubes, hoses and fittings therefor (including valves), and fittings for rigid pipes, all non-metallic; connectors (non-metallic -) for hoses; tube junctions (non-metallic -).
Owner
Prosecution history
- 05 Feb 2026 — REFUSAL PROCESSED BY IB
- 20 Jan 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 20 Jan 2026 — REFUSAL PROCESSED BY MPU
- 16 Dec 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 15 Dec 2025 — NON-FINAL ACTION WRITTEN
- 12 Dec 2025 — ASSIGNED TO EXAMINER
- 26 Oct 2025 — APPLICATION FILING RECEIPT MAILED
- 26 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 23 Oct 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB