W

Live / Allowed — Approved for publication (as of 01 Apr 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 25 Aug 2025 filing date already counts against anyone who files later.

Record

Serial number
79434732
Mark type
Design + words
Filed
25 Aug 2025
Attorney of record
Clifford D. Hyra

Goods and services

  • Class 007 — Machines and machine tools: Pumps for machines; screw pumps; pumps being machines for use in the food industry; replacement parts for the aforesaid goods, namely, shafts for pumps, rotors specially adapted for pumps for machines, stators being parts of machines and mechanical seals being parts of machines; pump control valves; metalworking machine tools; electric food processing machines; high pressure pumps for machines; hydraulic pumps; centrifugal pumps
  • Class 009 — Scientific and electric apparatus: Electrical and electronic controllers, in particular for pumps and pump installations; electric installations for the remote control of industrial operations.
  • Class 037 — Building construction and repair services: Pump repair or maintenance; pump repair and maintenance; repair and maintenance of feed or booster pumps; maintenance and repair of vacuum pumps; assembly, maintenance and repair of pumps and pump installations.
  • Class 040 — Treatment of materials: Custom manufacturing of pumps and pump installation systems.
  • Class 042 — Scientific and technological services: Technical engineering service for developing pumps and pump installation systems; development of hardware and software for controlling pumps and pump systems and for remotely controlling industrial operations.

Owner

Prosecution history

  • 01 Apr 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 30 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 30 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 30 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 26 Feb 2026 — REFUSAL PROCESSED BY IB
  • 12 Feb 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 12 Feb 2026 — REFUSAL PROCESSED BY MPU
  • 16 Jan 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 15 Jan 2026 — NON-FINAL ACTION WRITTEN
  • 08 Jan 2026 — ASSIGNED TO EXAMINER
  • 17 Oct 2025 — APPLICATION FILING RECEIPT MAILED
  • 17 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 16 Oct 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy