COMFORTMOUNT
Live / Applied — Non-final action mailed (as of 08 Dec 2025)
What this means for you
Not registered yet, but its 06 Jun 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79433951
- Mark type
- Stylized text
- Filed
- 06 Jun 2025
Goods and services
- Class 007 — Machines and machine tools: Hydraulic mount for machines, agricultural and construction machines, cranes, port and gantry cranes, in particular for driver cabins for the aforesaid goods; hydraulic dampening bearings for machines, agricultural and construction machines, cranes, port and gantry cranes, in particular for driver cabins for the aforesaid goods; vibration dampers for machines, agricultural and construction machines, cranes, port and gantry cranes, in particular for driver cabins for the aforesaid goods; shock and vibration absorbers for machines, agricultural and construction machines, cranes, port and gantry cranes, in particular for driver cabins for the aforesaid goods.
- Class 012 — Vehicles: Hydraulic mounts for agricultural vehicles, in particular for driver cabins for agricultural vehicles; hydraulic dampening bearings for agricultural vehicles, in particular for driver cabins for agricultural vehicles; vibration dampers for land vehicles, including in particular vibration dampers for driver cabins for agricultural vehicles; vibration insulation for agricultural vehicles, in particular for driver cabins for agricultural vehicles; hydraulic mount for self-propelled utility vehicles, in particular for driver cabins for the aforesaid goods; hydraulic dampening bearings for self-propelled utility vehicles, in particular for driver cabins for the aforesaid goods; vibration dampers for self-propelled utility vehicles, in particular for driver cabins for the aforesaid goods; shock and vibration absorbers for self-propelled utility vehicles, in particular for driver cabins for self-driving utility vehicles.
Owner
Prosecution history
- 25 Dec 2025 — REFUSAL PROCESSED BY IB
- 08 Dec 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 08 Dec 2025 — REFUSAL PROCESSED BY MPU
- 28 Oct 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 27 Oct 2025 — NON-FINAL ACTION WRITTEN
- 27 Oct 2025 — ASSIGNED TO EXAMINER
- 03 Oct 2025 — APPLICATION FILING RECEIPT MAILED
- 03 Oct 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 02 Oct 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB