Serial 79433150
Live / Applied — Non-final action mailed (as of 12 Feb 2026)
What this means for you
Not registered yet, but its 29 Jul 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79433150
- Mark type
- Design / logo
- Filed
- 29 Jul 2025
Goods and services
- Class 019 — Non-metallic building materials: Non-metallic modular liquid retention structures; non-metallic flood defence structures; non-metallic barriers; non-metallic modular barriers; non-metallic flood barriers; non-metallic modular flood barriers; non-metallic temporary dam structures; non-metallic modular dam structures; non-metallic temporary and transportable structures and barriers; non-metallic temporary and transportable structures and barriers for retaining water; materials for assembling non-metallic flood defence structures; non-metallic materials for assembling flood defence structures, liquid retention structures, dams and barriers; modular liquid retention structures, made primarily of non-metallic materials; flood defence structures, made primarily of non-metallic materials; barriers made primarily of non-metallic materials; modular barriers made primarily of non-metallic materials; flood barriers made primarily of non-metallic materials; modular flood barriers, made primarily of non-metallic materials; temporary dam structures, made primarily of non-metallic materials; modular dam structures, made primarily of non-metallic materials; temporary and transportable structures and barriers, made primarily of non-metallic materials; temporary and transportable structures and barriers for retaining water, made primarily of non-metallic materials; materials for assembling flood defence structures, made primarily of non-metallic materials; materials for assembling primarily non-metallic flood defence structures, liquid retention structures, dams and barriers; components of primarily non-metallic flood defence structures, liquid retention structures, dams and barriers; non-metallic components of flood defence structures, liquid retention structures, dams and barriers; primarily non-metallic components of flood defence structures, liquid retention structures, dams and barriers; parts, fittings and accessories for the aforesaid goods.
Owner
Prosecution history
- 26 Feb 2026 — REFUSAL PROCESSED BY IB
- 12 Feb 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 12 Feb 2026 — REFUSAL PROCESSED BY MPU
- 16 Jan 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 15 Jan 2026 — NON-FINAL ACTION WRITTEN
- 12 Dec 2025 — ASSIGNED TO EXAMINER
- 27 Sept 2025 — APPLICATION FILING RECEIPT MAILED
- 27 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 25 Sept 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB