LABTRONIC

Live / Applied — Non-final action mailed (as of 21 Nov 2025)

What this means for you

Not registered yet, but its 30 Apr 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79433118
Mark type
Stylized text
Filed
30 Apr 2025

Goods and services

  • Class 009 — Scientific and electric apparatus: Computer hardware and software for measuring, recording, evaluating, controlling, monitoring and/or regulating purposes for test benches to determine material, component and operational strengths; parts of the aforementioned goods and associated peripheral equipment, in particular monitors, display devices, input devices, transmission devices, output devices and data storage units; programs stored on data carriers for the above-mentioned purposes as well as for fatigue testing and fatigue load simulation, in particular for the acquisition and processing of measurement signals, the generation of test bench control signals, the logging of the test sequence, the evaluation of results and the management of test and test bench characteristic data; downloadable programs and program descriptions; measuring, detecting, monitoring and controlling devices; testing and quality control devices; test benches; servo-hydraulic system testing benches; electrical system testing benches; electrical and servo-hydraulic test apparatus and instruments; components of test benches including actuator modules and sensor modules; safety monitoring apparatus [electric].
  • Class 037 — Building construction and repair services: Installation, repair and maintenance of machinery; installation, repair and maintenance of testing machines and instruments; advisory services relating to the installation of safety equipment; consultancy services relating to all of the aforementioned.

Owner

Prosecution history

  • 11 Dec 2025 — REFUSAL PROCESSED BY IB
  • 21 Nov 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 21 Nov 2025 — REFUSAL PROCESSED BY MPU
  • 02 Oct 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 01 Oct 2025 — NON-FINAL ACTION WRITTEN
  • 29 Sept 2025 — ASSIGNED TO EXAMINER
  • 28 Sept 2025 — APPLICATION FILING RECEIPT MAILED
  • 28 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 25 Sept 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy