RIDDER
Live / Applied — Final refusal mailed (as of 09 Sept 2026)
What this means for you
Not registered yet, but its 29 Jul 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79432387
- Mark type
- Design + words
- Filed
- 29 Jul 2025
- Attorney of record
- Maria A. Scungio
Goods and services
- Class 007 — Machines and machine tools: Agricultural and horticultural machinery, machine tools and powered tools for use in horticulture, agriculture, floriculture and livestock farming; Machines for irrigation, machines for climate control and automation of industrial processes in greenhouses, floriculture, horticulture, agriculture; Drive systems having two or more synchronous motors coupled through clutches to drive a common load for ventilation and screening in greenhouses, horticulture, agriculture, floriculture and livestock farming; Drive systems lifting equipment, machine-operated drives and electromotive drives for ventilation in greenhouses; Climate screens and drive mechanisms for sun protection accessories for windows and doors in greenhouses and for opening, closing, securing and tilting windows and doors; Machine couplings and transmission belts (except for vehicles) for agricultural and horticultural machinery; Industrial robots; Agricultural harvesting robots for use in horticulture; Robotic machines for sowing, picking, caring for, planting, harvesting, feeding, fertilizing, tying up, pruning, clipping, cutting, treating, processing and harvesting plants, flowers, vegetables; Winches; Electrically powered windlasses
- Class 009 — Scientific and electric apparatus: Downloadable software for managing climate control and irrigation in agriculture, horticulture, greenhouses, floriculture and livestock farming; Sensors and monitoring equipment for environmental conditions in horticulture, agriculture, floriculture and livestock farming; Downloadable software, including software applications, for controlling electric power, lighting, heating, cooling, security and safety in smart buildings; Downloadable software for process optimization of remote maintenance in buildings, indoor cultivation environments and greenhouses; Downloadable software for remote managing of technical installations; Downloadable software for technical management of greenhouse climate control, irrigation systems and cultivation strategy; Computer hardware for use in greenhouses, horticulture, agriculture, floriculture and livestock farming; Downloadable software for building automation systems featuring, lighting, heating, cooling, security and safety, access, humidification, dehumidification, CO2 dosing, water disinfection and air treatment; Downloadable software for labor registration and management system; Downloadable software for managing climate data, crop data, production data and financial data in greenhouses, horticulture, agriculture, floriculture and livestock farming; Computer hardware and downloadable software, including software applications for managing downloadable operating software and Application Programming Interfaces for use in horticulture, agriculture, floriculture and livestock farming
- Class 011 — Environmental control apparatus: Water purification installations; Water treatment systems for filtering or infusing irrigation water with liquid fertilizer for use in greenhouses, agriculture, horticulture, floriculture and livestock farming; Installations for water delivery, fertilization, water reuse and water purification for use in greenhouses, agriculture, horticulture, floriculture and livestock farming in Class11; Apparatus for ventilating
- Class 037 — Building construction and repair services: Building construction services; Installation and repair services for industrial machines and industrial installations, namely, agricultural and horticultural machinery; Installation, repair and maintenance of machines and equipment for horticulture, agriculture, floriculture and livestock farming, namely, agricultural and horticultural machinery; Installation, repair and maintenance of climate control systems; Installation, repair and maintenance of water management and irrigation systems; Installation, repair and maintenance of automation systems for agriculture, horticulture, greenhouses, floriculture and livestock farming
- Class 042 — Scientific and technological services: Science and technology services, namely, research and development services relating to agriculture and horticulture; Industrial analysis and research services in the field of agriculture and horticulture; Industrial research in the field of agriculture and horticulture; Industrial design; Quality control for others; Authentication services to provide user access to online portals; Design and development of software for horticulture, agriculture, floriculture and livestock farming; Engineering services; Software as a service (SaaS) related to services featuring software for managing sales, engineering, production, logistics, purchasing, and service process operations in real time in the fields of horticulture, agriculture, floriculture and livestock farming
- Class 044 — Medical, beauty and agricultural services: Technical advice regarding cultivation strategy, namely managing climate control, water supply and use of labor tracking in horticulture, agriculture, floriculture and livestock farming
Owner
Prosecution history
- 09 Sept 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 09 Sept 2026 — FINAL REFUSAL E-MAILED
- 09 Sept 2026 — FINAL REFUSAL WRITTEN
- 28 Jul 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 28 Jul 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 28 Jul 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 19 Feb 2026 — REFUSAL PROCESSED BY IB
- 09 Feb 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 09 Feb 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 09 Feb 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
- 09 Feb 2026 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
- 03 Feb 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 03 Feb 2026 — REFUSAL PROCESSED BY MPU
- 07 Jan 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 06 Jan 2026 — NON-FINAL ACTION WRITTEN