CERO2

Live / Applied — Non-final action mailed (as of 20 Jan 2026)

What this means for you

Not registered yet, but its 30 Jul 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79431950
Mark type
Stylized text
Filed
30 Jul 2025

Goods and services

  • Class 006 — Metal goods: Building and construction materials and elements of metal; metal hardware; cables, wires and chains, of metal; wedges of metal; anchors of metal; rings of metal; couplings of metal for chains; metal nuts; metal locking mechanisms; common metals and their alloys.
  • Class 007 — Machines and machine tools: Industrial chains, namely chains for machines of all kinds as well as conveyor chains [machine parts]; parts of all the aforementioned chains; drive chains, except for land vehicles, namely chains and their accessories [as far as included in this class] of metal for drive and conveyor technology, in particular slat-band chains, plate-band chains, magnetic cams for metal magnetic flex chains; drive chains, other than for land vehicles, namely chains and their accessories [as far as included in this class] of plastic for drive and conveyor technology, in particular slat-band chains, magnetic flex-hinge chains, slat-band chains, accumulator roller chains, multiflex chains, box conveyor chains, special chains, mat belts, magnetic cams for plastic magnetic flex chains.
  • Class 012 — Vehicles: Chains for motor vehicles [including those for motorbikes] and for bicycles, in particular roller, bush and inverted tooth chains; chains for engines of motor vehicles [engine parts], including those of motorbikes, in particular roller, sleeve and inverted tooth chains; parts of all the aforementioned chains.

Owner

Prosecution history

  • 02 Apr 2026 — LIMITATION OF GOODS RECEIVED FROM IB
  • 05 Feb 2026 — REFUSAL PROCESSED BY IB
  • 20 Jan 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 20 Jan 2026 — REFUSAL PROCESSED BY MPU
  • 19 Dec 2025 — NEW REPRESENTATIVE AT IB RECEIVED
  • 19 Dec 2025 — CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
  • 16 Dec 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 15 Dec 2025 — NON-FINAL ACTION WRITTEN
  • 15 Dec 2025 — ASSIGNED TO EXAMINER
  • 24 Oct 2025 — CORRECTION TRANSACTION RECEIVED FROM IB
  • 10 Sept 2025 — APPLICATION FILING RECEIPT MAILED
  • 10 Sept 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 04 Sept 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy