CIMPOR SNOWHITE
Live / Allowed — Published for opposition (as of 03 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 23 May 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79431170
- Mark type
- Design + words
- Filed
- 23 May 2025
- Published for opposition
- 03 Mar 2026
- Attorney of record
- Mark M. Friedman
Goods and services
- Class 019 — Non-metallic building materials: Sand; gravel; crushed stone; asphalt; bitumen; cement; gypsum for use as building materials; mortar for building; concrete; marble blocks for construction; construction materials as finished products made of concrete, plaster, clay, potter's clay, stone, marble, wood, plastics and synthetic materials for building, construction, road building, namely, non-metallic paving tiles; buildings, transportable, not of metal; building materials, not of metal, namely, stair nosings; posts, not of metal, for power lines; barricades, not of metal; natural and synthetic coverings in the form of panels and sheets, as building materials, namely, non-metal coverings for roofs; bituminous board roof coverings being coatings; bituminous coating for roofs, wooden doors and windows and synthetic materials being non-metallic paving tiles; non-metallic, non-illuminated and non-mechanical road signs for roads; monuments and statuettes of stone, concrete and marble; building glass; prefabricated non-metallic swimming pools; aquarium sand.
Owner
Prosecution history
- 03 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 03 Mar 2026 — PUBLISHED FOR OPPOSITION
- 26 Feb 2026 — NOTIFICATION PROCESSED BY IB
- 25 Feb 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 11 Feb 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 10 Feb 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 03 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 26 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 26 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 26 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 25 Dec 2025 — REFUSAL PROCESSED BY IB
- 09 Dec 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 09 Dec 2025 — REFUSAL PROCESSED BY MPU
- 30 Oct 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 29 Oct 2025 — NON-FINAL ACTION WRITTEN