TRACKSFORMER
Live / Applied — Non-final action mailed (as of 10 Dec 2025)
What this means for you
Not registered yet, but its 09 Jun 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79430282
- Mark type
- Design + words
- Filed
- 09 Jun 2025
Goods and services
- Class 007 — Machines and machine tools: Loaders in the nature of conveyors being machines; loading machines; crawler-tracked loading machines; earthmoving loading machines; rubber tracks for crawlers being parts of construction machines; rubber tracks for use with crawlers being parts of mining machines; rubber tracks for use with crawlers being parts of loading-unloading machines; commercial rubber-tracked carriers in the nature of crawler-tracked loading machines for use as integrated tool carriers and for conveying tools; drilling rigs; excavators being earth moving machines; direct push power drills; and power operated pipe layers; earthmoving machines and parts, spare parts and fittings therefor, included in this class; machines and machinery for agricultural and industrial activities and parts, spare parts and fittings therefor, included in this class, namely, forestry mulcher, chain trenchers, agricultural machinery cultivator crawler dozer, agricultural robots vineyards, forest firefighting tracked tanks; industrial earthmoving machines and earthmoving machines in the nature of excavators, wheeled and tracked, and parts, spare parts and fittings therefor, included in this class; tractor-towed agricultural instrument grab attachments, namely, buckets, grapples and forks; compressors for machines; power transmission belts for industrial engines for industrial use; rubber tracks being parts of crawlers on construction machines; rubber tracks being parts of crawlers on mining machines.
Owner
Prosecution history
- 25 Dec 2025 — REFUSAL PROCESSED BY IB
- 10 Dec 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 10 Dec 2025 — REFUSAL PROCESSED BY MPU
- 01 Nov 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 31 Oct 2025 — NON-FINAL ACTION WRITTEN
- 28 Oct 2025 — ASSIGNED TO EXAMINER
- 15 Aug 2025 — APPLICATION FILING RECEIPT MAILED
- 15 Aug 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 14 Aug 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB