TIERREGROUP
Live / Applied — Response to non-final action entered (as of 01 Apr 2026)
What this means for you
Not registered yet, but its 19 Jun 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79429560
- Mark type
- Design + words
- Filed
- 19 Jun 2025
- Attorney of record
- Ben Natter
Goods and services
- Class 006 — Metal goods: Grease nipples; junctions of metal for pipes; steel tubes; tubes of metal; elbows of metal for pipes; branching pipes of metal; drain traps being valves of metal; collars of metal for fastening pipes; clips of metal for cables and pipes; water-pipe valves of metal; valves of metal, other than parts of machines; common metals and their alloys; small items of metal hardware, namely, metal fittings, connectors, couplings, brackets, clamps, joints, fasteners, and other metal components for use in compressed air, vacuum and neutral gas distribution systems; metal tubes and metal pipes and metal hardware components for use in constructing industrial fluid distribution networks and pneumatic system, containers of metal for storage and transport of goods ; metal and non-metal
- Class 017 — Rubber goods: Junctions, not of metal, for pipes; non-metal fittings for flexible pipes; fittings, not of metal, for rigid pipes; flexible hoses, not of metal; plastics in extruded form for use in manufacture;
- Class 019 — Non-metallic building materials: Branching pipes, not of metal; sandstone pipes; gutter pipes, not of metal; drain pipes, not of metal; rigid pipes, not of metal, for building; drain traps [valves], not of metal or plastic; water-pipe valves, not of metal or plastic; tanks of masonry; building materials, not of metal; pitch, tar, bitumen and asphalt; non-metallic transportable structures; monuments, not of metal.
Owner
Prosecution history
- 01 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 01 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 01 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 01 Jan 2026 — REFUSAL PROCESSED BY IB
- 18 Dec 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 18 Dec 2025 — REFUSAL PROCESSED BY MPU
- 30 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 11 Nov 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 10 Nov 2025 — NON-FINAL ACTION WRITTEN
- 06 Nov 2025 — ASSIGNED TO EXAMINER
- 14 Aug 2025 — APPLICATION FILING RECEIPT MAILED
- 14 Aug 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 07 Aug 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB