MANUKAI

Live / Allowed — Published for opposition (as of 10 Mar 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 17 Apr 2025 filing date already counts against anyone who files later.

Record

Serial number
79429299
Mark type
Stylized text
Filed
17 Apr 2025
Published for opposition
10 Mar 2026
Attorney of record
Stacey Halpern

Goods and services

  • Class 007 — Machines and machine tools: Machines, namely, computer numerical control milling machines, drilling machines, grinding machines for metalworking, electrical discharge machines (EDM), laser cutting machines, engraving machines, additive printing machines, stone working machines, plastic processing machines, semiconductor manufacturing machines; machines, namely, three dimensional (3D) printers, 3D bioprinters; machining centers for metalworking; machines, namely, Industrial robots; Automatic tool changers for industrial robots; machine tools for forming, riveting, swaging, and flaring of metal and plastics; machine tools, namely, chucks for power drills, blades for power tools, machine tool holders, machine tools for cutting and forming of materials; power-operated metalworking machine tools, namely, turning tools; motors and engines, other than for land vehicles; machine coupling and transmission components, other than for land vehicles
  • Class 009 — Scientific and electric apparatus: Scientific, research and teaching apparatus and instruments, namely, laboratory robots, teaching robots, humanoid robots having communication and learning functions for assisting people; 3D scanners; electronic plotters; Downloadable cloud-based software for CAD/CAM integration, computer numerical control programming, machine learning for use in robots, manufacturing process automation; Downloadable computer software for CAD/CAM integration, computer numerical control programming, machine learning for use in robots, manufacturing process automation; Recorded computer software for CAD/CAM integration, computer numerical control programming, machine learning for use in robots, manufacturing process automation; Downloadable computer software platforms for CAD/CAM integration, computer numerical control programming, machine learning for use in robots, manufacturing process automation; Downloadable computer software using artificial intelligence (AI) for machine learning; Downloadable virtual reality software for enabling the automation of manufacturing processes; downloadable augmented reality software for enabling the automation of manufacturing processes; Downloadable and recorded electronic databases in the field of manufacturing and computer numerical control programming; blank electronic storage media; computers; computer peripheral devices
  • Class 042 — Scientific and technological services: Scientific and technological services, namely conducting scientific feasibility studies, conducting of feasibility studies in the field of new technologies being proof of concept studies, scientific research, product testing and quality evaluation, and technological research in the field of manufacturing processes including but not limited to computer numerical control programming and machines as well as product research and design services relating thereto; industrial analysis and industrial research services, in the fields of feasibility studies, proof of concept studies, scientific research, product testing and evaluation, and business model analysis in the field of manufacturing including but not limited to computer numerical control programming and machines and industrial design services; quality control for others; user authentication services using technology for e-commerce transactions, design and development of computers and software

Owner

Prosecution history

  • 10 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 10 Mar 2026 — PUBLISHED FOR OPPOSITION
  • 05 Mar 2026 — NOTIFICATION PROCESSED BY IB
  • 04 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 18 Feb 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 17 Feb 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
  • 10 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 09 Feb 2026 — EXAMINER'S AMENDMENT ENTERED
  • 09 Feb 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 09 Feb 2026 — EXAMINERS AMENDMENT E-MAILED
  • 09 Feb 2026 — EXAMINERS AMENDMENT -WRITTEN
  • 07 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 07 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 07 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 22 Nov 2025 — REFUSAL PROCESSED BY IB

View this trademark record on Marksy