X-TENDA

Live / Allowed — Publication / registration review complete (as of 28 Aug 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 29 Apr 2025 filing date already counts against anyone who files later.

Record

Serial number
79429221
Mark type
Stylized text
Filed
29 Apr 2025
Published for opposition
15 Sept 2026
Attorney of record
Molly Buck Richard

Goods and services

  • Class 006 — Metal goods: Building materials of metal, namely, framing, beams, walls, wall sheeting, doors, building trims, ceilings, floors, roofs, telescopic framing for buildings, metal wall panels, trusses for roof and floor, structural framing; construction materials made of metal, namely, structural steel; rivets of metal; connectors of metal, namely, connectors for connecting sections of telescopic steel framing for buildings; structural joint connectors of metal; metal construction frames; metal door frames; frames of metal for building
  • Class 007 — Machines and machine tools: Machines for construction purposes, namely, for manufacturing steel construction materials; rolling machines for rolling metals
  • Class 037 — Building construction and repair services: Building, plumbing, installation services and electrical installation services; cleaning, maintenance and repair, all in relation to rolling machines for rolling metals; cleaning, maintenance and repair, all in relation to construction machines for manufacturing steel construction materials; construction of walls; construction and renovation of buildings and other structures; construction of ceilings; construction of buildings; custom construction of buildings; construction of office buildings; building of offices; installation of machines; machine repair; construction services; building construction

Owner

Prosecution history

  • 09 Sept 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 20 Aug 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 15 May 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 14 May 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 14 May 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 18 Dec 2025 — REFUSAL PROCESSED BY IB
  • 05 Dec 2025 — NEW REPRESENTATIVE AT IB RECEIVED
  • 04 Dec 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 04 Dec 2025 — REFUSAL PROCESSED BY MPU
  • 22 Oct 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 21 Oct 2025 — NON-FINAL ACTION WRITTEN
  • 18 Sept 2025 — ASSIGNED TO EXAMINER
  • 08 Aug 2025 — APPLICATION FILING RECEIPT MAILED
  • 08 Aug 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 31 Jul 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Marksy