BRAKE-CHECKER
Live / Applied — Non-final action mailed (as of 06 Dec 2025)
What this means for you
Not registered yet, but its 04 Jun 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79428610
- Mark type
- Stylized text
- Filed
- 04 Jun 2025
Goods and services
- Class 009 — Scientific and electric apparatus: Measuring, signalling, detecting, testing, inspecting apparatus and instruments, more specifically apparatus for monitoring, issuing signals and error information, evaluating switch statuses, storing error statuses and metering operating hours of electromagnetic actuators, in particular electromagnetically actuated brakes, couplings and valves; apparatus and instruments for conducting, switching, transforming, regulating or controlling the distribution or use of electricity, more specifically apparatus for measuring voltage and current, supplying voltage and regulating the voltage supply of electromagnetic actuators, in particular electromagnetically actuated brakes, couplings and valves; software, more specifically software for monitoring, issuing signals and error information, evaluating switch statuses, storing error statuses and metering operating hours of electromagnetic actuators, in particular electromagnetically actuated brakes, couplings and valves.
- Class 042 — Scientific and technological services: Control, monitoring and diagnosis of electromagnetic actuators, in particular electromagnetically actuated brakes, couplings and valves; design and development of software, in particular software for monitoring, issuing signals and error information, evaluating switch statuses, storing error statuses and metering operating hours of electromagnetic actuators, in particular electromagnetically actuated brakes, couplings and valves.
Owner
Prosecution history
- 25 Dec 2025 — REFUSAL PROCESSED BY IB
- 06 Dec 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 06 Dec 2025 — REFUSAL PROCESSED BY MPU
- 25 Oct 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 24 Oct 2025 — NON-FINAL ACTION WRITTEN
- 23 Oct 2025 — ASSIGNED TO EXAMINER
- 31 Jul 2025 — APPLICATION FILING RECEIPT MAILED
- 31 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 24 Jul 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB