HY-BRAID
Live / Applied — Non-final action mailed (as of 29 Oct 2025)
What this means for you
Not registered yet, but its 08 Apr 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79428425
- Mark type
- Stylized text
- Filed
- 08 Apr 2025
Goods and services
- Class 006 — Metal goods: Pipes, tubes, hoses of metal and accessories thereof, including valves; pipes and tubes of metal; junctions of metal for pipes; flanges of metal; couplings of metal for non-electric cables; metal pipe muffs; wires, cables and chains of metal; flexible pipes of metal; steel pipes; stainless steel tubes; couplings of metal for pipes.
- Class 012 — Vehicles: Vehicle brakes; brake cables for bicycles; clutch cables [motorcycle parts]; brake cables [motorcycle parts]; brake cables for bicycles; brake calipers for vehicles; main brake cylinders; clutch cylinders for land vehicles; pipes and tubes of metal [parts of vehicles], in particular hydraulic pipes and tubes, of metal, for use in relation to the following goods: brakes; non-electric cables and wires of common metals, in particular clutch cables, accelerator cables and brake cables; hydraulic circuits for vehicles.
- Class 017 — Rubber goods: Flexible hoses not of metal; washers of rubber or vulcanized fiber; insulators for cables; pipe gaskets; gaskets for use as liquid-tight seals; junctions, not of metal, for pipes; latex [rubber]; plastic materials in extruded form used in production; muffs for insulating engines; pipe muffs, not of metal; insulating sleeves for machinery; rubber hose for cable termination; non-metallic seals for cables; non-metallic oil seals; coupling sleeves, not of metal, for pipes; coupling sleeves, not of metal, for pipes; rubber sleeves for protecting parts of machines; water-tight rings; hydraulic hoses made of rubber; hydraulic hoses made of plastic.
Owner
- J.JUAN S.A.U., ES
Prosecution history
- 15 Nov 2025 — REFUSAL PROCESSED BY IB
- 29 Oct 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 29 Oct 2025 — REFUSAL PROCESSED BY MPU
- 12 Sept 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 11 Sept 2025 — NON-FINAL ACTION WRITTEN
- 04 Sept 2025 — ASSIGNED TO EXAMINER
- 25 Jul 2025 — APPLICATION FILING RECEIPT MAILED
- 25 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 24 Jul 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB