EVEROX

Live / Allowed — Publication / registration review complete (as of 10 Sept 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 16 May 2025 filing date already counts against anyone who files later.

Record

Serial number
79427650
Mark type
Design + words
Filed
16 May 2025
Published for opposition
29 Sept 2026
Attorney of record
Brent E. Routman

Goods and services

  • Class 006 — Metal goods: Building and constructions materials and elements made of metal, namely, reinforcing materials of metal for concrete; metal concrete construction hardware, namely, reinforcing bars, meshes and cages for concrete; steel fibers for concrete reinforcement
  • Class 019 — Non-metallic building materials: Building and constructions materials and elements made of sand, stone, rock, clay, minerals and concrete, namely, concrete; ready-mix concrete; precast concrete elements, namely, wall panels, bridge beams, foundation piles, retaining wall blocks and drainage pipes; concrete blocks; concrete bricks; non-metal slabs of concrete; concrete panels; concrete pipes; concrete paving stones; concrete tiles; kerbstones being concrete blocks; railway sleepers not of metal; non-metal beams; pre-fabricated concrete columns; concrete foundations piles and foundation blocks; Mortar mix; cement mortar mix; concrete screed for use on floors and pavements; Flooring screed material, namely concrete; grout; shotcrete being concrete mix; Aggregates, namely, recycled concrete aggregates, coarse aggregates and fine aggregates; sand; gravel; crushed stones; construction aggregates, namely, recycled concrete aggregates, coarse aggregates and fine aggregates; Fillers, namely, fine mineral fillers for use in concrete, mortar and cement compositions; mineral fillers for use in concrete, mortar and cement compositions; limestone filler for use in cement, concrete and mortar compositions; Cement; blended cement; hydraulic cement; cementitious binders for use in concrete, mortar and construction materials; Masonry materials, namely, concrete blocks, concrete bricks and masonry units; bricks; clay bricks; calcium silicate bricks; Paving materials, namely, concrete paving stones, paving slabs and paving blocks; paving slabs, not of metal; nonmetallic paving blocks; kerbs being concrete blocks; edging stones; Structural and infrastructure elements, namely, bridge beams, foundation piles, wall panels, culverts and drainage structures; retaining wall elements, namely, concrete retaining wall blocks and retaining wall panels; tunnel segments, namely, precast concrete tunnel lining segments; culverts made of concrete for construction, namely, drainage culverts made of concrete used to channel water; drainage channels made of concrete for construction, namely, drainage culverts made of concrete used to channel water; Concrete drainage structures, namely, storm manholes; Road construction materials, namely, recycled concrete aggregates, road base materials and paving aggregates; base materials, namely, recycled aggregate for road construction, railway construction, soil stabilization; subbase materials, namely, recycled aggregate subbase materials for road construction, railway construction, soil stabilization
  • Class 040 — Treatment of materials: Upcycling in the nature of waste recycling

Owner

Prosecution history

  • 04 Sept 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 24 Aug 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 24 Aug 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 24 Aug 2026 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
  • 20 May 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 20 May 2026 — FINAL REFUSAL E-MAILED
  • 20 May 2026 — FINAL REFUSAL WRITTEN
  • 29 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 29 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 29 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 05 Dec 2025 — REFUSAL PROCESSED BY IB
  • 19 Nov 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 19 Nov 2025 — REFUSAL PROCESSED BY MPU
  • 30 Sept 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 29 Sept 2025 — NON-FINAL ACTION WRITTEN

View this trademark record on Marksy