EREVO
Live / Registered — Registered (as of 24 Mar 2026)
What this means for you
Registered since 24 Mar 2026. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79427649
- Registration number
- 8182378
- Mark type
- Design + words
- Filed
- 10 Apr 2025
- Published for opposition
- 03 Feb 2026
- Registered
- 24 Mar 2026
- Attorney of record
- Prakash NAMA
Goods and services
- Class 009 — Scientific and electric apparatus: Electric cables; transformers; ducting for electric cables; voltage stabilizing power supply; electricity distribution consoles; electrical distribution systems, namely, power distribution panels; electrical distribution boxes; automatic switchboards; electric installations for the remote control of industrial operations; automation systems for power plants, comprising industrial automation controls.
- Class 035 — Advertising and business services: Appointment scheduling services; Sponsorship search.
- Class 042 — Scientific and technological services: Technological research relating to power supply; telecommunications technology consultancy; custom design of prototypes; industrial design; technical research in the field of building construction; computer technology consultancy; computer programming; rental of meters for the recording of energy consumption; consulting in the field of software using artificial intelligence for data analytics; technological research in the field of manufacturing processes.
Owner
Prosecution history
- 24 Mar 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 24 Mar 2026 — REGISTERED-PRINCIPAL REGISTER
- 03 Feb 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 03 Feb 2026 — PUBLISHED FOR OPPOSITION
- 28 Jan 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 09 Jan 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 15 Nov 2025 — REFUSAL PROCESSED BY IB
- 14 Nov 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 14 Nov 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 14 Nov 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 24 Oct 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 24 Oct 2025 — REFUSAL PROCESSED BY MPU
- 07 Sept 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 06 Sept 2025 — NON-FINAL ACTION WRITTEN
- 05 Sept 2025 — ASSIGNED TO EXAMINER