Serial 79427001
Live / Applied — Non-final action mailed (as of 27 Oct 2025)
What this means for you
Not registered yet, but its 08 Apr 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79427001
- Mark type
- Design / logo
- Filed
- 08 Apr 2025
Goods and services
- Class 007 — Machines and machine tools: Battery cable rolling machines; packaging machines; agitators for chemical processing; lifting machines; metalworking machines; iron slab casting machines; wind-powered installations for generating electricity [wind power plants]; finishing machines; power-driven spanners; machines for the electronics industry; optical cold working machines; machines for generating gas by electrolysis; powder coating spray guns; dynamos; pumps [machines]; shaft couplings [machines]; laser welding machines; filter presses.
- Class 009 — Scientific and electric apparatus: Counters; photocopiers [photographic, electrostatic, thermic]; ultrasonic thickness gauges; digital signs; micrometer screws for optical instruments; distribution boxes [electricity]; electric apparatus for commutation; fire extinguishing apparatus for automobiles; radiological apparatus for industrial purposes; batteries, electric; humanoid robots with artificial intelligence for preparing beverages.
- Class 011 — Environmental control apparatus: Lamps; lighting apparatus for vehicles; acetylene flares; cooling installations and machines; air cooling apparatus; hot air ovens; pressure water tanks; water flushing installations; purification installations for sewage.
- Class 035 — Advertising and business services: Advertising; commercial information agency services; import-export agency services; personnel recruitment; systemization of information into computer databases; book-keeping; rental of vending machines; rental of sales stands; sponsorship search; retail services for pharmaceutical, veterinary and sanitary preparations and medical supplies.
Owner
Prosecution history
- 15 Nov 2025 — REFUSAL PROCESSED BY IB
- 27 Oct 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 27 Oct 2025 — REFUSAL PROCESSED BY MPU
- 10 Sept 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 09 Sept 2025 — NON-FINAL ACTION WRITTEN
- 04 Sept 2025 — ASSIGNED TO EXAMINER
- 14 Jul 2025 — APPLICATION FILING RECEIPT MAILED
- 14 Jul 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 03 Jul 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB