SCM FRIGO
Live / Allowed — Published for opposition (as of 24 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 16 Dec 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 79426582
- Mark type
- Design + words
- Filed
- 16 Dec 2024
- Published for opposition
- 24 Mar 2026
- Attorney of record
- Keith A. Weltsch
Goods and services
- Class 011 — Environmental control apparatus: Gas condensers, other than parts of machines; gas refrigerators; air cooling apparatus; water cooling installations and refrigerating machines for industrial use; air-conditioning installations; refrigerating apparatus in the form of cooling units for industrial purposes; refrigerating machines; installations for cooling water; heating installations for industrial use; heat pumps; cooling evaporators; heat exchangers not being parts of machines for air-conditioning apparatus, for refrigerating apparatus, for cooling apparatus; ice machines and apparatus; refrigerators; refrigerating counters, namely, modular counters for refrigerating, heating and chilling foods; refrigerated shipping containers; freezers; refrigerator-freezers; refrigerating cabinets; refrigerating chambers; portable refrigerators; freezing apparatus and installations, namely, electric freezers; water coolers; heat exchangers, not parts of machines; fans for air-conditioners; cooling evaporators; walk-in coolers; ventilators for heat exchangers; hot water heating installations; expansion tanks for central heating installations; filters for air conditioning; water heaters for industrial use; regulating accessories for water supply, namely, metered valves and pressure regulators for gas pipes; cooling installations for water; water heaters; industrial and commercial refrigeration systems comprising refrigerating machines
Owner
- SCM FRIGO S.P.A., IT
- SCM FRIGO S.P.A., IT
Prosecution history
- 24 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 24 Mar 2026 — PUBLISHED FOR OPPOSITION
- 19 Mar 2026 — NOTIFICATION PROCESSED BY IB
- 18 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 04 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 03 Mar 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 26 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 17 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 14 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 14 Feb 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 05 Sept 2025 — REFUSAL PROCESSED BY IB
- 15 Aug 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 15 Aug 2025 — REFUSAL PROCESSED BY MPU
- 04 Jul 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 03 Jul 2025 — NON-FINAL ACTION WRITTEN