SP SPOTTI SERGIO COIL PROCESSING S.R.L.
Live / Applied — Non-final action mailed (as of 07 Nov 2025)
What this means for you
Not registered yet, but its 15 Apr 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79426334
- Mark type
- Design + words
- Filed
- 15 Apr 2025
Goods and services
- Class 007 — Machines and machine tools: Metalworking machines
- Class 009 — Scientific and electric apparatus: Electric installations for the remote control of industrial operations
- Class 037 — Building construction and repair services: Machinery installation, maintenance and repair; repair or maintenance of metalworking machines and tools; repair of metalworking machines and apparatus; repair or maintenance of machines and apparatus for processing foods
- Class 042 — Scientific and technological services: Industrial design
Owner
Prosecution history
- 30 Nov 2025 — REFUSAL PROCESSED BY IB
- 07 Nov 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 07 Nov 2025 — REFUSAL PROCESSED BY MPU
- 18 Sept 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 17 Sept 2025 — NON-FINAL ACTION WRITTEN
- 10 Sept 2025 — ASSIGNED TO EXAMINER
- 27 Jun 2025 — APPLICATION FILING RECEIPT MAILED
- 27 Jun 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 25 Jun 2025 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
- 19 Jun 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB