OUR ENERGY POWERS LIFE

Live / Allowed — Published for opposition (as of 31 Mar 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 30 Apr 2025 filing date already counts against anyone who files later.

Record

Serial number
79426171
Mark type
Stylized text
Filed
30 Apr 2025
Published for opposition
31 Mar 2026
Attorney of record
Griffin Barnett

Goods and services

  • Class 004 — Lubricants and fuels: Anthracite; natural gas; solidified gases being fuel; electrical energy; ethanol fuels; coal; coke; mazut; petroleum, raw or refined; oil-gas, namely, gas oil; fuel gas; hydrogen fuel
  • Class 037 — Building construction and repair services: Drilling of deep oil or gas wells; drilling of wells; mining extraction; vehicle battery charging; charging of electric vehicles; hydraulic fracturing services and fracking services; natural gas refuelling services for motor vehicles; rental of portable power chargers; rental of battery chargers; repair of power lines; pipeline construction and maintenance
  • Class 039 — Transportation and storage services: Electricity distribution; distribution of energy
  • Class 040 — Treatment of materials: Production of renewable green energy; production of energy; destruction of waste and trash; waste treatment; processing of oil; recycling of waste and trash; upcycling in the nature of waste recycling; rental of batteries; rental of electricity generators
  • Class 042 — Scientific and technological services: Analysis for oil-field exploitation; geological test drilling; oil-well testing; geological surveys; geological prospecting; scientific research in the field of environmental protection; providing scientific information, advice and consultancy relating to carbon offsetting; providing scientific information, advice and consultancy relating to net zero emissions; consultancy in the field of energy efficiency for energy-saving; exploration services in the field of the oil, gas and mining industries

Owner

Prosecution history

  • 31 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 31 Mar 2026 — PUBLISHED FOR OPPOSITION
  • 26 Mar 2026 — NOTIFICATION PROCESSED BY IB
  • 25 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 11 Mar 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 11 Mar 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
  • 04 Mar 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 13 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 13 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 13 Feb 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 30 Nov 2025 — REFUSAL PROCESSED BY IB
  • 09 Nov 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 09 Nov 2025 — REFUSAL PROCESSED BY MPU
  • 23 Sept 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 22 Sept 2025 — NON-FINAL ACTION WRITTEN

View this trademark record on Marksy