KOMPAQDRAIN
Live / Applied — Non-final action mailed (as of 24 Nov 2025)
What this means for you
Not registered yet, but its 14 May 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79426089
- Mark type
- Stylized text
- Filed
- 14 May 2025
Goods and services
- Class 019 — Non-metallic building materials: Floor drainage channels made of non-metallic materials, namely, trench drains that are concrete drainage structures; floor drainage channels of polymer concrete, namely, trench drains that are polymer concrete drainage structures
Owner
Prosecution history
- 11 Dec 2025 — REFUSAL PROCESSED BY IB
- 24 Nov 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 24 Nov 2025 — REFUSAL PROCESSED BY MPU
- 07 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 07 Oct 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 06 Oct 2025 — NON-FINAL ACTION WRITTEN
- 24 Sept 2025 — ASSIGNED TO EXAMINER
- 27 Jun 2025 — APPLICATION FILING RECEIPT MAILED
- 27 Jun 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 24 Jun 2025 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
- 19 Jun 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB