ELASTIC NP1 CONSTRUCTION
Live / Applied — Response to non-final action entered (as of 05 Feb 2026)
What this means for you
Not registered yet, but its 16 Dec 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79425580
- Mark type
- Design + words
- Filed
- 16 Dec 2024
- Attorney of record
- Andrew T. Rissler
Goods and services
- Class 001 — Chemicals: Chemicals used in industry, science, photography, agriculture, horticulture and forestry, except fungicides, herbicides, insecticides and parasiticides; manures and soils for growing; unprocessed artificial resins and unprocessed plastics; fire extinguishing compositions; adhesives not for medical, household and stationery purposes, namely adhesives for industrial use.
- Class 017 — Rubber goods: Raw or semi-worked rubber, gutta-percha, gum, asbestos, mica and semi-finished synthetic goods made from these materials in the form of powder, bars, panels and foils; insulation, stopping and sealing materials, namely insulation paints, insulation fabrics, insulating tape and rubber bands for industrial uses, insulation covers for industrial machinery, joint sealant compounds for joints, pipe gaskets, non-metal O-rings for sealing purposes, other than gaskets for motors, cylinders and washer for water taps; flexible pipes made from rubber and plastic; hoses made of plastic and rubber, for use in vehicles; junctions for pipes of plastic and rubber, pipe jackets of plastic and rubber, hoses of textile material; junctions for pipes, not of metal; pipes jackets, not of metal; connecting hose for vehicle radiators; synthetic padding and stuffing materials, namely, plastic waddings.
Owner
Prosecution history
- 05 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 05 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 05 Feb 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 23 Aug 2025 — REFUSAL PROCESSED BY IB
- 07 Aug 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 07 Aug 2025 — REFUSAL PROCESSED BY MPU
- 21 Jun 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 20 Jun 2025 — NON-FINAL ACTION WRITTEN
- 17 Jun 2025 — ASSIGNED TO EXAMINER
- 16 Jun 2025 — APPLICATION FILING RECEIPT MAILED
- 16 Jun 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 16 Jun 2025 — LIMITATION FROM ORIGINAL APPLICATION ENTERED
- 05 Jun 2025 — SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB