Serial 79425160
Dead / Abandoned — Abandoned — failure to respond (as of 05 Mar 2026)
What this means for you
This application is over — abandoned 23 Feb 2026. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79425160
- Mark type
- Design / logo
- Filed
- 26 Jul 2024
- Abandoned
- 23 Feb 2026
Goods and services
- Class 017 — Rubber goods: Shock-absorbing buffers of plastic for blinds and blackout systems, shock-absorbing stops of plastic materials for blinds and blackout systems, rubber stops for blinds and blackout systems; semi-processed thermoplastic elastomers in the form of lateral guide profiles for vertical roller blinds; semi-processed thermoplastic elastomers in the form of upper guiding profiles for vertical roller blinds; semi-processed thermoplastic elastomers in the form of lower guide profiles for vertical roller blinds; damping material of plastic materials in the form of bearings for vertical roller blinds.
- Class 020 — Furniture: Curtain rings; pulleys of plastics for blinds; runners for roller blinds; plastic hardware for roller blind rails; anchoring devices [hardware] not of metal for roller blinds; curtain rings, curtain hooks, curtain rollers, curtain tie-backs, curtain rails, clips not of metal for fastening curtains or blinds; rails (non-metallic -) for roller blinds; hooks (not of metal) for roller blinds; hooks (not of metal) for roller blind slide systems; curtain sliding guides; sliding guides of thermoplastic materials for roller blinds; curtain suspension devices; clips of plastic materials; clamps (non-metallic) for fixing roller blinds; plastic couplings for roller blinds; fittings for curtains; plastic pulleys for lateral sliding for roller blinds.
Owner
- PLASTEX SA, CH
Prosecution history
- 05 Mar 2026 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 05 Mar 2026 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 05 Sept 2025 — REFUSAL PROCESSED BY IB
- 21 Aug 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 21 Aug 2025 — REFUSAL PROCESSED BY MPU
- 18 Jul 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 17 Jul 2025 — NON-FINAL ACTION WRITTEN
- 07 Jun 2025 — ASSIGNED TO EXAMINER
- 06 Jun 2025 — APPLICATION FILING RECEIPT MAILED
- 06 Jun 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 05 Jun 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB