CALMFLOOR

Live / Allowed — Published for opposition (as of 08 Sept 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 17 Mar 2025 filing date already counts against anyone who files later.

Record

Serial number
79424169
Mark type
Stylized text
Filed
17 Mar 2025
Published for opposition
08 Sept 2026
Attorney of record
Carolyn Juarez

Goods and services

  • Class 007 — Machines and machine tools: Vibration damper machines; machines for reducing vibration in buildings; active mass damper machines for reducing vibration in buildings and other structures; active mass damper machines for reducing vibration in the floors of buildings; vibration damper machines for reducing vibration in buildings and other structures; machines for reducing vibration in buildings and other structures; machines for reducing vibration in the floors of buildings; machines for active vibration control for reducing vibration in the floors of buildings; machines for active vibration control of floors of buildings for mitigation of vibration in buildings and structures caused by high winds, earthquakes, traffic and other natural and manmade forces, and parts and fittings therefor; machines for active vibration control for controlling, reducing, mitigating, and eliminating vibration in the floors of buildings to improve the serviceability, usability, functionality and performance of buildings and structures; machines for active vibration control for controlling, reducing, mitigating, and eliminating vibration in the floors of buildings to improve the environment for visitors to and occupants and users of buildings and structures; parts and fitting for the aforesaid goods.

Owner

Prosecution history

  • 08 Sept 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 08 Sept 2026 — PUBLISHED FOR OPPOSITION
  • 03 Sept 2026 — NOTIFICATION PROCESSED BY IB
  • 02 Sept 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 19 Aug 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 19 Aug 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
  • 10 Aug 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 07 Jul 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 07 Jul 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 07 Jul 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 19 Mar 2026 — REFUSAL PROCESSED BY IB
  • 27 Feb 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 27 Feb 2026 — REFUSAL PROCESSED BY MPU
  • 02 Feb 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 01 Feb 2026 — NON-FINAL ACTION WRITTEN

View this trademark record on Marksy