REVOLEFIN
Live / Allowed — Published for opposition (as of 10 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 26 Feb 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79423477
- Mark type
- Design + words
- Filed
- 26 Feb 2025
- Published for opposition
- 10 Mar 2026
- Attorney of record
- Michael T. Smith
Goods and services
- Class 001 — Chemicals: Catalytic agents; chemicals for industrial purposes; ethylene glycol; terephthalic acid; acrylonitrile; caprolactam; chemicals for use in the production of synthetic rubber; chemicals for the manufacture of paints; solvents for paints; solvents for lacquers; solvents for varnishes; chemicals for manufacturing detergents; alkylbenzene; adhesives for industrial use; chemical fertilizers; agricultural chemicals, except fungicides, herbicides, insecticides and parasiticides
- Class 037 — Building construction and repair services: Plant construction; construction services, namely, chemical plant construction services; consultancy for chemical plant construction; construction consultancy; providing information on chemical plant construction; maintenance and repair of manufacturing plants; building construction supervision; providing construction information; construction project management services relating to chemical plant construction; construction project management services; repair or maintenance of chemical plants
- Class 042 — Scientific and technological services: Plant engineering services; technical consulting services in the fields of plant engineering; designing plant components and equipment used for chemical plants; technical consulting services in the fields of designing plant components and equipment used for chemical plants; architectural design; surveying; preparation of reports relating to technical project studies for construction projects
Owner
Prosecution history
- 10 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 10 Mar 2026 — PUBLISHED FOR OPPOSITION
- 04 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 14 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 13 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 13 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 13 Feb 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 10 Oct 2025 — REFUSAL PROCESSED BY IB
- 25 Sept 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 25 Sept 2025 — REFUSAL PROCESSED BY MPU
- 13 Aug 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 12 Aug 2025 — NON-FINAL ACTION WRITTEN
- 11 Aug 2025 — NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
- 26 Jun 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 25 Jun 2025 — NON-FINAL ACTION WRITTEN