PROLYTE 4

Live / Allowed — Approved for publication (as of 01 Apr 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 07 Mar 2025 filing date already counts against anyone who files later.

Record

Serial number
79422814
Mark type
Design + words
Filed
07 Mar 2025
Attorney of record
Candice M. Kwok

Goods and services

  • Class 006 — Metal goods: Common metals and their alloys; metal building materials, namely, metal floor and roof trusses for stages and temporary event structures, metal dance towers in the nature of metal lighting floor trusses for stage use; metal floor trusses, namely, sound delay towers for supporting loudspeakers; metal floor trusses, namely, ground-support towers for stage and event structures; metal roof truss structures for stages and live event venues; metal materials for building and construction, namely, metal rigging hardware, namely, shackles, snap hooks of metal, metal bolts, metal pins, metal clips, metal pick-up bars, and metal mounting clamps, and metal accessories for trusses, namely, metal corner connectors, metal spigots, metal clevis pins, and metal base plates.; girders of metal; metal floor trusses; metal roof trusses; metal roofing; buildings, transportable, of metal; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery and metal rigging hardware, namely, shackles, snap hooks of metal, metal bolts, metal pins, metal clips, metal pick-up bars, and metal mounting clamps, and metal accessories for trusses, namely, metal corner connectors, metal spigots, metal clevis pins, and metal base plates; small items of metal hardware, namely, metal rigging hardware, namely, shackles, snap hooks of metal, metal bolts, metal pins, metal clips, metal pick-up bars, and metal mounting clamps, and metal accessories for trusses, namely, metal corner connectors, metal spigots, metal clevis pins, and metal base plates; pipes and tubes of metal; safes; metal hardware for buildings, namely, metal rigging hardware, namely, shackles, snap hooks of metal, metal bolts, metal pins, metal clips, metal pick-up bars, and metal mounting clamps, and metal accessories for trusses, namely, metal corner connectors, metal spigots, metal clevis pins, and metal base plates; ores of metal; metal materials for building, namely metal rigging hardware, namely, shackles, snap hooks of metal, metal bolts, metal pins, metal clips, metal pick-up bars, and metal mounting clamps, and metal accessories for trusses, namely, metal corner connectors, metal spigots, metal clevis pins, and metal base plates; floors of metal; structural frameworks of metal for buildings; steel tubes; pipework of metal; gratings of metal; gates of metal; rails of metal; metal staging being portable stages composed of primarily metal materials; floor boards of metal; portable metal free-standing barriers for crowd control; building and construction materials and elements of metal, namely, metal floor and roof trusses for stages and temporary event structures, metal dance towers in the nature of metal lighting floor trusses for stage use; metal beams; fittings of metal for building doors and windows; stages for musical performances composed of primarily metal materials; all the foregoing for use with truss and support structures

Owner

Prosecution history

  • 02 Apr 2026 — NEW REPRESENTATIVE AT IB RECEIVED
  • 01 Apr 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 31 Mar 2026 — EXAMINER'S AMENDMENT ENTERED
  • 31 Mar 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 31 Mar 2026 — EXAMINERS AMENDMENT E-MAILED
  • 31 Mar 2026 — EXAMINERS AMENDMENT -WRITTEN
  • 19 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 19 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 19 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 10 Oct 2025 — REFUSAL PROCESSED BY IB
  • 23 Sept 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 23 Sept 2025 — REFUSAL PROCESSED BY MPU
  • 12 Aug 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 11 Aug 2025 — NON-FINAL ACTION WRITTEN
  • 08 Aug 2025 — ASSIGNED TO EXAMINER

View this trademark record on Marksy