ALVAR & AINO AALTO

Live / Applied — Non-final action mailed (as of 08 Oct 2025)

What this means for you

Not registered yet, but its 25 Mar 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79422523
Mark type
Stylized text
Filed
25 Mar 2025

Goods and services

  • Class 006 — Metal goods: Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores.
  • Class 011 — Environmental control apparatus: Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes.
  • Class 014 — Jewelry: Precious metals and their alloys and goods in precious metals or coated therewith, not included in other classes; jewellery, precious stones; horological and chronometric instruments.
  • Class 019 — Non-metallic building materials: Building materials (non-metallic); non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal.
  • Class 020 — Furniture: Furniture.
  • Class 037 — Building construction and repair services: Building construction; repair; installation services.
  • Class 041 — Education and entertainment services: Education; providing of training; entertainment; sporting and cultural activities.
  • Class 042 — Scientific and technological services: Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software.

Owner

Prosecution history

  • 24 Oct 2025 — REFUSAL PROCESSED BY IB
  • 08 Oct 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 08 Oct 2025 — REFUSAL PROCESSED BY MPU
  • 26 Aug 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 25 Aug 2025 — NON-FINAL ACTION WRITTEN
  • 22 Aug 2025 — ASSIGNED TO EXAMINER
  • 27 Apr 2025 — APPLICATION FILING RECEIPT MAILED
  • 27 Apr 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 24 Apr 2025 — SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB

View this trademark record on Marksy